Updated Rated A+ 2026
Standpipe maintained under pressure and equipped with low pressure alarm
Maintained as needed
Standpipe including piping leading to FD connec on, inspected visually
Daily
construc on drawings used to confirm rou ng of unexposed standpipe sec ons
Daily
FDNY/CSFM daily reports must be kept by documen ng standpipe inspec ons, fire ex ngusher
inspec ons,and upkeep permit logs
Daily
FDNY first responders box maintenance and execu on evacua on drills
daily, quarterly
standpipe pressurizing system, and alarm tested
weekly
licensed plumber/ fire suppression contractor perform air/water test of standpipe
during alarm installa on
standpipe alarm installa on documented by CSFM
during alarm installa on
standpipe alarm soundings logged and documenta on includes descrip on of response to
alarm
per incident
standpipe repaired and retested un l retes ng is successful a&er filed bi-weekly test by licensed
plumber/fire suppression subcontractor. Repairs documented
a&er failed biweekly inspec on
, sprinkler systems for use at construc on sites shall be provided, maintained and made available
for FD use
maintained as needed
CSFM shall be responsible for verifying FDNY hot work permit and supervising the issuance of
authoriza ons for hot work opera ons
daily
a fire guard is required at each hot work opera on while in progress and shall con nue on site
for minimum of 30 minutes a&er each hot work opera on is complete. A log book shall be
maintained on site
daily
a fire guard shall be assigned one floor below hot work opera ons for fire exposures that are
not observable by fire guard on the floor above
daily
a fire guard shall perform patrols from 1600-2400 (4pm-12am)
daily
all fire guards shall have Cer ficate of Fitness
maintained as needed
Watch person shall be onsite from 2400-0800 (12am-8am)with the ability to no fy the FD in
case of fire.
daily
Hot works permit should be onsite
daily
First responders box contains Emergency contact numbers, FDNY permits, floor by floor logis cs
plan, enlarged first floor evacua on plan, standpipe riser diagram, Daily log and checklist binder
Gang Box
Coordinate with local firehouse loca on of gang box
daily
Acknowledgement of zero-tolerance no smoking policy signed by all workers