Facility walk through inspections include all except the following:
A Functional test of audible and visual alarms
B Functional test of the line leak detectors
C Inspection of the impressed current cathodic protection system (if present)
D Inspection of spill response equipment - ANS B Functional test of the line leak detectors
Prior to receiving a delivery, you should ------
A Calculate the available space in the tank taking the overfill limit
B Contact the driver to determine the scheduled time of the delivery
C Close your station to prepare for the delivery
D Calculate the available space in the tank based on the tank's maximum capacity - ANS A
Calculate the available space in the tank taking the overfill limit
Spill buckets must be tested _
A Every 3 years
B Every year
CEvery other year
@COPYRIGHT 2026/2027 ALLRIGHTS RESERVED 1
, D Only during secondary containment testing - ANS B Every year
Secondary containment testing for UST Systems monitored by one of these continuous (vapor,
pressure, hazardous substance) methods:
A Is not required
B Must be conducted every other year
C Must be conducted every three years
D Must be conducted annually - ANS A Is not required
Underground storage tank systems installed after july 1 2003 must be
A Product tight, meaning no liquid or vapor can escape from the system
B Double-walled and product tight, meaning no liquid or vapor can escape from system
C Monitored by a continuous (vapor, pressure, hazardous substance) method
D Constructed of steel with an outer and inner fiberglass coating - ANS B Double-walled and
product tight, meaning no liquid or vapor can escape from system
Underground storage tank systems installed after July 1, 2004, must be
Product tight, meaning no liquid or vapor can escape from the system
Double-walled and product tight, meaning no liquid or vapor can escape from system
Monitored by a continuous (vapor, pressure, hazardous substance) method
@COPYRIGHT 2026/2027 ALLRIGHTS RESERVED 2
QUESTIONS AND ANSWERS GRADED A+
2026
Facility walk through inspections include all except the following:
A Functional test of audible and visual alarms
B Functional test of the line leak detectors
C Inspection of the impressed current cathodic protection system (if present)
D Inspection of spill response equipment - ANS B Functional test of the line leak detectors
Prior to receiving a delivery, you should ------
A Calculate the available space in the tank taking the overfill limit
B Contact the driver to determine the scheduled time of the delivery
C Close your station to prepare for the delivery
D Calculate the available space in the tank based on the tank's maximum capacity - ANS A
Calculate the available space in the tank taking the overfill limit
Spill buckets must be tested _
A Every 3 years
B Every year
CEvery other year
@COPYRIGHT 2026/2027 ALLRIGHTS RESERVED 1
, D Only during secondary containment testing - ANS B Every year
Secondary containment testing for UST Systems monitored by one of these continuous (vapor,
pressure, hazardous substance) methods:
A Is not required
B Must be conducted every other year
C Must be conducted every three years
D Must be conducted annually - ANS A Is not required
Underground storage tank systems installed after july 1 2003 must be
A Product tight, meaning no liquid or vapor can escape from the system
B Double-walled and product tight, meaning no liquid or vapor can escape from system
C Monitored by a continuous (vapor, pressure, hazardous substance) method
D Constructed of steel with an outer and inner fiberglass coating - ANS B Double-walled and
product tight, meaning no liquid or vapor can escape from system
Underground storage tank systems installed after July 1, 2004, must be
Product tight, meaning no liquid or vapor can escape from the system
Double-walled and product tight, meaning no liquid or vapor can escape from system
Monitored by a continuous (vapor, pressure, hazardous substance) method
@COPYRIGHT 2026/2027 ALLRIGHTS RESERVED 2