What is the purpose of the RM step, develop cont - probability
-To determine whether the risk of an adverse
event occurring.
Residual risk mean - -Risk that remains after all
controls
You are part of combat patrol. - -Pedestrian at
the market-
What METT-TC factor is at the root - -Troops &
equipment
First step of RM - -Identify hazard.
How do on-duty leaders - -By ensuring
What is the intersection of assessed probability. - subordinates
-Risk level
Not a RM principal - -Apply rm process where
Off duty risk decisions are - -Responsibility of serious injury
the individual soldiers
Terms " catastrophic, critical, moderate,& negligible -
How are hazards identified during mission planning - -Level of severity
-Applying the METT-TC
Controls designed to do - -Reduce or eliminate
What factors can cause controls that are established risk
- -Overconfident or complacency
Fifth step in RM - -Supervise & evaluate
What step in RM is focused on determining. - -
Assess hazards
Method is used to implement controls in rm - -
Communicate, coordinate, implement & integrate.
What is RM - -A decision making process for
identifying hazards
RM process step requires a cycle of continuous. -
-Develop controls & make risk decisions
What do the term " frequent, likely- - -Level of
1/1