Choose an answer
AASHTO T 99 refers to which
1 Basics covered in Level 1 2
proctor
Sampling at the roadway is done
3 What is a modified proctor used in 4
for
Don't know?
Terms in this set (93)
, Basics covered in Level 1 Nuclear Testing
Speedy Moisture
Report Forms
Earthwork has to do with the Earthwork is the excavation and placement of
roadway in what way? soils and materials supporting the proposed
roadway.
In Earthwork what is a lift? 6" of compacted depth at full width
In Earthwork what is a Lot? A lot is 1 lift at 500 ft or within compacted area.
Isolated compaction operations are separate
lots.
Sampling at the roadway is done Done for base, sub grade, and embankment.
for
Sampling is determined how generated with random numbers usually by a
Verification Inspector
What is important about sampling Minimum of three representative sample
at the roadway combined.
What is LIMS? Laboratory Info Management System
The proctor theory is when by inputting energy to expel air and water in the
compaction is achieved how soil voids
Compaction causes An increase in unit weight, decrease in
compressibility and permeability.
The proctor is determined where In a laboratory and establishes a density standard
and creates what to be used on the roadway
MOST TESTED QUESTIONS AND VERIFIED
ANSWERS (100% Correct solutions)| GET IT
RIGHT!! | ALREADY GRADED A+
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Standard
Choose an answer
AASHTO T 99 refers to which
1 Basics covered in Level 1 2
proctor
Sampling at the roadway is done
3 What is a modified proctor used in 4
for
Don't know?
Terms in this set (93)
, Basics covered in Level 1 Nuclear Testing
Speedy Moisture
Report Forms
Earthwork has to do with the Earthwork is the excavation and placement of
roadway in what way? soils and materials supporting the proposed
roadway.
In Earthwork what is a lift? 6" of compacted depth at full width
In Earthwork what is a Lot? A lot is 1 lift at 500 ft or within compacted area.
Isolated compaction operations are separate
lots.
Sampling at the roadway is done Done for base, sub grade, and embankment.
for
Sampling is determined how generated with random numbers usually by a
Verification Inspector
What is important about sampling Minimum of three representative sample
at the roadway combined.
What is LIMS? Laboratory Info Management System
The proctor theory is when by inputting energy to expel air and water in the
compaction is achieved how soil voids
Compaction causes An increase in unit weight, decrease in
compressibility and permeability.
The proctor is determined where In a laboratory and establishes a density standard
and creates what to be used on the roadway