2026/2027 WITH ACTUAL CORRECT
QUESTIONS AND VERIFIED DETAILED
ANSWERS |CURRENTLY TESTING
QUESTIONS AND SOLUTIONS|ALREADY
GRADED A+|NEWEST |BRAND NEW
VERSION|JUST RELEASED!!
The medical air dew point high alarm from each compressor site will indicate at the master
alarm panels when the line pressure dew point is greater that _ *F?
A) +22
B) +32
C) +35
D) +44
C) +35
The instrument air dew point high alarm from each compressor site will indicate at the master
alarm panels when the line pressure dew point is greater than _ *F?
A) -22
B) -32
C) -35
D) -44
A) -22
Area alarm panels for medical gas systems shall indicate when line pressure in the area being
monitored increases or decreases _ % from normal operating pressure?
1|Page
,A) 10
B) 15
C) 20
D) 25
C) 20
In positive pressure systems area alarm sensors for vital life support and critical care areas shall
be located on which side of the zone valve box assemblies?
A) main line side
B) patient or use side
C) source side
D) upstream side
B) patient or use side
Areas for anesthetizing gas delivery shall have area alarm pressure sensors installed on the _
side of the individual room zone valve box assembly?
A) in
B) patient
C) source
D) source or patient
D) source or patient
If there is more than one source equipment location in a facility, it shall be necessary for each
location to have separate alarms at the _ panels?
A) area
2|Page
,B) fire
C) master
D) security
C) master
High carbon monoxide levels in a medical air system shall be indicated at each local alarm. The
alarm shall activate at _ ppm or higher?
A) 10
B) 20
C) 100
D) 1000
A) 10
Fittings for positive pressure medical gas systems must be cleaned for oxygen service by the _
supplier, or other agency prior to installation?
A) authority having jurisdiction
B) certifier
C) manufacturer
D) owner
C) manufacturer
It is the responsibility of the _ to furnish documentation certifying that all installed piping and
materials are cleaned for oxygen service?
A) architect
B) engineer
3|Page
, C) installer
D) verifier
C) installer
Medical-surgical vacuum system piping, when hard-drawn seamless copper tube, shall be in
accordance with any of the following except?
A) ASTM B88
B) ASTM B280
C) ASTM B597
D) ASTM B819
C) ASTM B597
Which of the following piping materials shall be permitted for field installed medical-surgical
vacuum distribution piping systems?
A) carbon steel pipe
B) galvanized pipe
C) plastic pipe
D) stainless steel pipe
D) stainless steel pipe
Brazed joints shall be made using a brazing alloy that exhibits a melting temperature in excess of
_ *F to retain the integrity of the piping system in the event of fire?
A) 800
B) 1000
C)1200
4|Page