IAEM CEM/AEM PRACTICE EXAM 2025-
2026 ACTUAL EXAM Complete Verified
Questions And Correct Detailed Answers|
GUARANTEED PASS Graded A+
Within the EOP, the ________ contains general information while ________ provide(s)
specific information and direction related to all hazards.
a) basic plan; supporting annexes
b) supporting annex; hazard-specific appendices
c) basic plan; hazard-specific appendices
d) supporting annex; the basic plan
A+ TEST BANK 1
, IAEM CEM/AEM PRACTICE EXAM
Feedback: The correct answer is a.
The basic plan should include plan objectives, strategies, and background information.
Supporting annexes and hazard-specific appendices provide specific information and
direction, but hazard-specific appendices include hazard-specific response procedures.
_________, emergency management professionals should ensure the plan is adequate,
feasible, acceptable, complete, compliant, and inclusive.
a) To determine goals and objectives
b) Before forming a collaborative planning team
c) After a plan is presented to elected or appointed officials
d) Before a plan is presented to elected or appointed officials
Feedback: The correct answer is d
. After being drafted, a plan should undergo a thorough validation and review process
before being presented to elected or appointed officials.
Typically, the federal government supplies ____ percent of Public Assistance (PA) funds
while the state government supplies the other ____ percent.
a) 60; 40
b) 75; 25
c) 90; 10
d) 25; 75
Feedback: The correct answer is b.
A+ TEST BANK 2
, IAEM CEM/AEM PRACTICE EXAM
Normally, the federal government covers 75% of PA funds while the state covers the
remaining 25%. However, the federal share may increase in the event of a major disaster.
Which component of PPD-8 involves estimating capability requirements and validating
capabilities?
a) National Preparedness System
b) National Mitigation Framework
c) National Preparedness Goal
d) National Response Framework
Feedback: The correct answer is a.
The National Preparedness System has six components: identifying and assessing risk,
estimating capability requirements, building and sustaining capabilities, planning to deliver
capabilities, validating capabilities, and reviewing and updating.
Planning objectives should be SMART: specific, measurable, achievable, realistic, and
________.
a) trustworthy
b) time-based
c) technical
d) transparent
Feedback: The correct answer is b.
Objectives should also be time-based, perhaps by stating the date by which the desired
outcome should be achieved or the length of time it should take to achieve the objective.
A rolling summary report is a(n) ________.
A+ TEST BANK 3
, IAEM CEM/AEM PRACTICE EXAM
a) collection of after-action reports (AARs)
b) analysis of exercise outcomes, trends, and issues
c) description of the roles and responsibilities of exercise planners and participants
d) compilation of information documents that provide a synopsis of an operations-based
exercise
Feedback: The correct answer is b.
This defines a rolling summary report, a component of exercise program management that
should be developed and distributed to stakeholders either quarterly or biennially.
Which of the following will not help children recover from a disaster?
a) Explaining, calmly and firmly, what has happened and will happen.
b) Answering questions with easy-to-follow answers.
c) Encouraging children to stay aware of ongoing developments through the TV, Internet,
radio, etc.
d) Using positive language to keep conversations optimistic.
Feedback: The correct answer is c.
While children's questions should be answered, it's important to limit children's exposure to
the media, which may lead to fear and confusion instead of reassurance and understanding.
In the context of hazard mitigation, an "exposure" is ________.
a) the potential dollar loss for a critical vulnerable asset in a planning area
b) a person, property, system, or function that could be lost to a hazard
c) a description of an identified hazard based on characteristics such as location, impact, etc.
d) a table created for an identified hazard that lists the number, value, and occupancy of
structures for each type of asset in a planning area
A+ TEST BANK 4