Medical Gas Practice Test 2 2026 update| questions and
verified answers (complete solutions) |
1. Installers of a category 1 Medical gas pipe distribution system must be
qualified in accordance with ASSE 6010. What is certification requirement
for installers of Category
3 Medical gas pipe distribution system?: 6010
2. When is the initial pressure test conducted by the installer?: After blowdown
of the distribution piping
3. In those
portions of systems intended to handle oxygen pressures greater than 350
PSI, the interconnecting hose shall not contain
materials.: Polymeric
4. Which of these is an NFPA 99 requirement for the labeling of pipes
in a medical gas system.: Color coding
5. A wireless communication device is employed in a medical gas or vacuum
warning system. Which type of supervision is required for this device?: The
device shall be supervised such that failure communication shall initiate an alarm.
, 6. Wat sort of treatment is permitted before brazing the cut ends of a tube to
be installed
in medical gas piping system: The cut ends may be rolled smooth or deburred
7. Manifolds for gas cylinders
shall actuate a
signal and shall activate an indicator
at all alarm panels to indicate when, or just before, changeover from
one header
to the other.: Local signal to master alarm panel
8. Where liquid ring compressors are used, air receivers shall be equipped
with a high
water level sensor that activates a
alarm indicator.: Local
9. Instrument air systems shall activate the alarm systems when the dew
point at system pressure exceeds how many degrees Fahrenheit: -22 degrees
10. In a non-anesthetizing area, on which side of the zone valve shall the
,pressure / vacuum sensor be located?: Station Outlet / Inlet
11. What is the purpose of using an oxygen analyzer in the pipeline
purge prior to brazing?: To assure that all ambient air has been removed from the pipeline
12. Performance qualifications of Braziers shall remain in effect
indefinitely unless the Brazier does not raise with the qualifying procedure
for longer than what time period.: 6 months
13. Pipe labels should be located at a maximum interval at how many
feet?: 20 ft
14. The installation of medical gas and vacuum systems, including
brazing, shall be made by experienced, qualified and competent installers.
Installers shall be certified to the requirements which codes/standards?: ASME
section IX
15. The removal of components within a source system for repair and
reinstallation, or for replacement, shall be treated as new work, or as in the
purposes of testing, whenever the work requires which of the following:: Cutting
and/or brazing of new pipe
16. A
verified answers (complete solutions) |
1. Installers of a category 1 Medical gas pipe distribution system must be
qualified in accordance with ASSE 6010. What is certification requirement
for installers of Category
3 Medical gas pipe distribution system?: 6010
2. When is the initial pressure test conducted by the installer?: After blowdown
of the distribution piping
3. In those
portions of systems intended to handle oxygen pressures greater than 350
PSI, the interconnecting hose shall not contain
materials.: Polymeric
4. Which of these is an NFPA 99 requirement for the labeling of pipes
in a medical gas system.: Color coding
5. A wireless communication device is employed in a medical gas or vacuum
warning system. Which type of supervision is required for this device?: The
device shall be supervised such that failure communication shall initiate an alarm.
, 6. Wat sort of treatment is permitted before brazing the cut ends of a tube to
be installed
in medical gas piping system: The cut ends may be rolled smooth or deburred
7. Manifolds for gas cylinders
shall actuate a
signal and shall activate an indicator
at all alarm panels to indicate when, or just before, changeover from
one header
to the other.: Local signal to master alarm panel
8. Where liquid ring compressors are used, air receivers shall be equipped
with a high
water level sensor that activates a
alarm indicator.: Local
9. Instrument air systems shall activate the alarm systems when the dew
point at system pressure exceeds how many degrees Fahrenheit: -22 degrees
10. In a non-anesthetizing area, on which side of the zone valve shall the
,pressure / vacuum sensor be located?: Station Outlet / Inlet
11. What is the purpose of using an oxygen analyzer in the pipeline
purge prior to brazing?: To assure that all ambient air has been removed from the pipeline
12. Performance qualifications of Braziers shall remain in effect
indefinitely unless the Brazier does not raise with the qualifying procedure
for longer than what time period.: 6 months
13. Pipe labels should be located at a maximum interval at how many
feet?: 20 ft
14. The installation of medical gas and vacuum systems, including
brazing, shall be made by experienced, qualified and competent installers.
Installers shall be certified to the requirements which codes/standards?: ASME
section IX
15. The removal of components within a source system for repair and
reinstallation, or for replacement, shall be treated as new work, or as in the
purposes of testing, whenever the work requires which of the following:: Cutting
and/or brazing of new pipe
16. A