Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

NCCCO Crane Certification Test Study Guide | Practice Questions & Prep Guide

Rating
-
Sold
-
Pages
17
Grade
A+
Uploaded on
19-03-2026
Written in
2025/2026

Prepare for the NCCCO Crane Operator Certification with this comprehensive study guide. Covers crane types, safety regulations, rigging, load charts, operational procedures, and practice questions to help operators succeed in certification exams.

Show more Read less
Institution
NCCCO Crane Certification
Course
NCCCO Crane Certification

Content preview

NCCCO CRANE CERTIFICATION TEST STUDY GUIDE Questions and Correct
Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download
Pdf
Study online at https://quizlet.com/_j58fc3

1. Distribute over a larger area. What is the purpose of
placing mats or cribbing
under outrigger floats?

2. Upperworks. Where is the best location
for leveling a crane?

3. there is no weight of the crane bearing on any tires Before leveling a mobile
crane on outriggers, an
operator should ensure:

4. Operating a mobile crane with a long boom, on un- Keeping a 90° angle be-
even ground, what support condition should be con- tween cylinder rod and
sidered? pad.

5. Operating a mobile crane with a long boom, on un- Keeping 90° angle be-
even ground, what support condition should be con- tween cylinder rod and
sidered? pad.

6. When may blocking (cribbing) be placed under outrig- Never approved.
ger beams on mobile cranes?

7. Mobile cranes should be level to within what percent 1%
of grade?

8. Timber crane mats work best when they are: bolted together.

9. When arriving in the crane at the job site, the operator access roads.
should first determine the condition of the:

10. What surface listed below would NOT be a good loca- Above underground
tion for assembly or setup of a mobile crane? vaults.


, NCCCO CRANE CERTIFICATION TEST STUDY GUIDE Questions and Correct
Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download
Pdf
Study online at https://quizlet.com/_j58fc3


11. Each outrigger pad and its blocking should be suffi- The total weight of the
cient to support? crane and its load.

12. How does high wind affect a mobile crane with a long Introduces side load onto
boom? the boom

13. When is the only time the outrigger beams should be The load chart indicates
less than fully that this is allowed.
extended?

14. What is the primary purpose for a rooster sheave or Separate the load hoist
auxiliary boom point sheave? lines.

15. Eccentric main boom tip reeving causes which of the twisting of the main
following: boom.

16. Which type of wire rope listed below is installed on Right regular lay.
most cranes?

17. The hoist drum flange shall extend a minimum of 1/2 inch.
_______ over the top layer of wire rope at all times while
crane is in operation.

18. Which of the following is classified as a standing wire Pendant line.
rope?

19. When lifting on outriggers, the floats or pads should secured to the outriggers
always be: cylinder.

20. 6




, NCCCO CRANE CERTIFICATION TEST STUDY GUIDE Questions and Correct
Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download
Pdf
Study online at https://quizlet.com/_j58fc3
How many randomly broken wires in a lay length must
there be on a mobile cranes hoist line, before it should
be removed from service?

21. What is the minimum design factor required for a 3.5
right regular lay, boom or hoist wire rope?

22. On a mobile crane, how many broken wires are per- 1
mitted at the end
connection of a pendant before it must be taken out
of service?

23. Type 1 rotation resistant hoist wire rope has a design 5 to 1
factor of:

24. It is important to know when lubricating crane hoist not hinder visual inspec-
wire rope, that the lubricant must: tion.

25. How often is the competent person required to in- Each shift.
spect the running wire ropes on a mobile crane?

26. On mobile cranes, how many broken wires must be 3
present in one strand of one lay for running wire rope
to be removed from service?

27. How many randomly distributed broken wires in ro- 2 broken wires in 6 rope
tation-resistant hoist wire rope are considered for re- diameters.
placement?

28. According to OSHA, what is the minimum number 2
of full wraps of wire rope that must remain on hoist
drums in all service conditions?

Written for

Institution
NCCCO Crane Certification
Course
NCCCO Crane Certification

Document information

Uploaded on
March 19, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$20.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
kingdom
1.0
(1)

Get to know the seller

Seller avatar
kingdom stuvia
Follow You need to be logged in order to follow users or courses
Sold
6
Member since
1 year
Number of followers
0
Documents
887
Last sold
4 months ago

1.0

1 reviews

5
0
4
0
3
0
2
0
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions