Exam Practice Questions And Correct
Answers (Verified Answers) Plus
Rationale 2026 Q&A| Instant Download
Licensing and Administrative Law
1. Which Alaska statute defines the powers and duties of a Mechanical
Administrator?
A) AS 08.40
B) AS 11.05
C) AS 22.30
D) AS 34.10
Answer: A
Rationale: AS 08.40 specifically addresses the licensing, powers, and responsibilities of
Mechanical Administrators in Alaska .
2. Under 12 AAC 39, what is the minimum experience required to qualify for a
Residential Plumbing and Hydronic Heating license?
A) 1 year of apprenticeship
B) 2 years of supervised work in the trade
,C) 4 years of related experience
D) No experience required, only exam pass
Answer: B
Rationale: The regulation mandates at least two years of supervised experience in the
applicable trade .
3. In Alaska, a Mechanical Administrator may add a new category to an existing
license by submitting which form?
A) AS-08-01
B) 12 AAC 39-03 Application for Additional Category
C) RPHH-Add-Form
D) No form; a new license is required
Answer: B
Rationale: The regulation specifies the 12 AAC 39-03 form for adding categories to an
existing license .
4. What is the total fee for the Mechanical Administrator license (application plus
license fee)?
A) $250
B) $300
C) $350
D) $400
Answer: C
Rationale: The total fees for the Mechanical Administrator license are $350—$150 for
the application and $200 for the license itself .
5. What is the minimum amount of surety bond required for a Mechanical
Administrator license in Alaska?
, A) $5,000
B) $10,000
C) $15,000
D) $25,000
Answer: B
Rationale: Alaska law mandates a $10,000 bond for Mechanical Administrators to
ensure financial responsibility for the public .
Permits and Inspections
6. When must a permit be obtained for a residential water heater replacement in
Alaska?
A) Only if the capacity exceeds 50 gallons
B) For any replacement involving new piping connections
C) Never, replacements are exempt
D) Only for gas-fired units
Answer: B
Rationale: A permit is required whenever new piping is added or altered, regardless of
heater size .
7. Which inspection is required after installing a new vent stack for a hydronic
boiler?
A) Electrical inspection
B) Structural inspection
C) Mechanical inspection of venting
D) Fire alarm inspection
Answer: C
Rationale: The mechanical inspector verifies proper sizing, material, and termination of
boiler venting .