TEST
A documented technique for recurrent use in the repair of a non-
conformance
Standard
which type of discrepancy process permits a discrepancy
WITHOUT REWORK INSTRUCTIONS
General P/U
A shakedown inspection is done When?
after a dimensional inspection
when a new or derivative aircraft is being designed and built, the
prototype is subject to extensive design reviews, instructions,
functional testing and series of flight test conducted by both Boeing
and the FAA what type of certificate does the the FAA issue when
compliance with the FAA airworthiness standards is fully
demonstrated
certificate of AIRWORTHINESS
which certificate authorizes the production of reasonable duplicates
of aircraft including replacement and modification parts
production certificate
In the Boeing document hierarchy,procedures provide authority for
which type of document
business process instructions
END OF
PAGE
1
, BOEING QUALITY (QA) LATEST
TEST
which type of document describes details of how to do the jobs that
need to be done to accomplish a goal
detailed instructions
Escape is a Boeing term used when
Defective part leaves the immediate area
A disclosure is a letter sent when
a defective part has been sent to the airline customer
these people with this attitude do not see themselves as making a
great deal of difference in what happens to them. when things ho
well they think it's good luck. when things go badly, they attribute it
to bad luck or feel that someone else is responsible they leave the
action to others for better or worse
RESIGNATION
Who of the following can legally void an inspection stamp?
the supervisor of the inspector who stamped it
the presence of an inspection stamp on production order inspection
column signifies
acceptance of that operation
CAPP receives its parts and BOM data from
PDM
END OF
PAGE
2