Splices in rall tracks shall have - 🧠 ANSWER ✔✔Smooth Joints
Hydraulic systems should have their proper fluid level checked - 🧠
ANSWER ✔✔Daily
,If power fails during operations, the following shouldn't apply - 🧠 ANSWER
✔✔Do your best to finish moving load where it was designated to go
If load is undetermined who is to find out if load weight does not exceed
crane rating at radius at which the load is to be lifted - 🧠 ANSWER
✔✔Person responsible for lift
Where should climbing instructions be kept - 🧠 ANSWER ✔✔ON Site
All climbing operations shall be performed under the supervision of - 🧠
ANSWER ✔✔Qualified person
When cranes are erected, load limiting devices shall be tested for proper
setting and operation - 🧠 ANSWER ✔✔Before crane is placed in service
Hooks shall be equipped with latches unless the application makes the use
of the latch - 🧠 ANSWER ✔✔Impractical
Size and position of signs or panels must satisfy the limitations of - 🧠
ANSWER ✔✔Manufacturer
Fall prevention measures are needed for working at locations where you
are exposed - 🧠 ANSWER ✔✔To a fall of 6ft or more
, Travel distance on hand levers shall not be greater - 🧠 ANSWER ✔✔than
14 inches from neutral position
For power lines rated 175KV the minimum clearance between the lines and
any part of the crane or load is - 🧠 ANSWER ✔✔15ft
All controls shall be tested by the operator at the - 🧠 ANSWER ✔✔start of
new shift
Before each climbing operation all load members of the support system
shall be - 🧠 ANSWER ✔✔Inspected
Chain slings are required to be - 🧠 ANSWER ✔✔ID tagged
Welding on loads suspended by the crane can only be done if the load has
- 🧠 ANSWER ✔✔Insulated slings
How much does an average cubic yard of concrete weight - 🧠 ANSWER
✔✔4,000 lbs
Main power switch for tower crane is - 🧠 ANSWER ✔✔At base of crane
Items not listed in the frequent inspection checklist are - 🧠 ANSWER
✔✔Hydraulic pumps and valves for excessive wear or damage