The lean ratio of an extension ladder 4:1
According to AHERA, to complete a response action
of a non- 5 samples taken inside
with results of each <0.0 f/cc NESHAP size project, how
many samples must be taken with
results of what?
,What are the notification 20 calendar days for any project greater than
requirements in Virginia? 10 sq feet or linear feet
, In what jurisdiction do Need a license everywhere
individuals need an asbestos
supervisor or working
linsense
Type of bond that would Performance Bond
ensure that the general
contractor will compensate
subcontractors for labor and
materials
Minimum respiratory protection Full face air purifying respirator
on a class 1 asbestos project
with no NEA
What is the maximum content 23.5%