ANSWERS ASSURED SUCCESS
Close out final report
Includes both a draft and corrected final report. Contains
chronological outline of construction activities and required
site documentation
Adobe acrobat format with bookmarks
DOR
Designer of Record
Variations from accepted design
Requires DOR and GCR to ensure compliance with the contract
Government will not formally agree or provide an opinion prior
to DOR approval or recommendation and reserves the right to
reject
Substitutions
Requires details submitted for government acceptance, DOR
must confirm and document the the proposed product meets
, contract requirements and is equal in function, performance,
quality, and salient features
Format of SD 01 precon submittals
Contractors approval stamp applied to separate sheet
accompanying document
Provide data in full unit of measure used in contract document
Format of SD-02 shop drawings
Not less than 8 1/2 by 11" nor more than 30 by 42" except for
full size patterns or templates
Accurate size with scale indicated
Ensure suitable for reproduction and of quality to produce
clear, distinct lines and letters, with dark lines on white
background
Electronic copy submitted in PDF format
Drawing Identification
Must have title, number, date, revision numbers and dates