⩥ Analyzing the scope of a project and determining the probability of
success is called:
Scope determination.
Success analysis.
Feasibility study.
Project audit.
Scope-success study. Answer: Feasibility study.
⩥ Processes in the _________________ process group are concerned
with completing the actual project deliverables.
initiating
planning
executing
monitoring and controlling
closing Answer: executing
⩥ The Project Management Body of Knowledge PMBOK (6th ed.)
contains _________________ core areas.
, five
eight
nine
ten
twelve Answer: ten
⩥ Projects are:
Temporary
Typically ongoing
Never successful
To be avoided
Indefinite Answer: Temporary
⩥ Errors made when estimating the expected or actual performance of
the project, resulting in an inaccurate picture of the project status,
happen in the:
initiating process group.
planning process group.
executing process group.
monitoring and controlling process group.
closing process group. Answer: monitoring and controlling process
group.