Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

ASPE CPD Study Questions AH Exam Complete Test , Practice Questions, Verified Answer Key, and Study Guide for (Latest 2026 Edition)

Beoordeling
-
Verkocht
3
Pagina's
57
Cijfer
A+
Geüpload op
24-03-2026
Geschreven in
2025/2026

ASPE CPD Study Questions AH Exam Complete Test , Practice Questions, Verified Answer Key, and Study Guide for (Latest 2026 Edition)

Instelling
ASPE CPD
Vak
ASPE CPD

Voorbeeld van de inhoud

3/24/26, 8:12 AM ASPE CPD Study Questions AH Exam Complete Test , Practice Questions, Verified Answer Key, and Study Guide for (Latest 2026 …




ASPE CPD Study Questions AH Exam Complete
Test , Practice Questions, Verified Answer Key,
and Study Guide for (Latest 2026 Edition)

Save




Terms in this set (358)



Front Back


What is the specific weight of water? 62.4 lbs per cubic foot


What happens in a storm and A smoke pressure test is recommended with a
sanitary system after it passes the smoke pressure of 1 in wc to prove the system gas
water test? tight.


Is an air test acceptable for a storm Yes, if a water test is not possible, at a pressure of 5
and sanitary system? psi, are tests are impractical and costly


What are the testing procedures for A water test upon completion of the rough piping
the storm and sanitary system? and prior to concealment of 10 ft wc minimum
(except the topmost 10 feet of pipe), not to exceed
100 ft wc. If system is higher than 100 feet, test
plugs must be installed to facilitate testing, rarely
are more than 7 stories tested at one time. A
peppermint oil test may also be done with 2 oz of
peppermint oil and 10 qt boiling water, and
searching for peppermint smell at leaks, however it
is difficult to pinpoint the leak by this method

https://quizlet.com/1159643988/aspe-cpd-study-questions-ah-exam-complete-test-practice-questions-verified-answer-key-and-study-guide-for-latest-… 1/57

,3/24/26, 8:12 AM ASPE CPD Study Questions AH Exam Complete Test , Practice Questions, Verified Answer Key, and Study Guide for (Latest 2026 …



The maximum length from the vent To prevent a dead end where slime, sludge and
connection to any future drain outlet fungi can grow, 2 feet, unless the piping must be
is required by code, why, how long is extended to an accessible location for a cleanout
the distance (listed in the book), and
what’s the exception?


A sanitary tee may be used in the A double sanitary tee because the possibility of
vertical but what may not be used in flow crossover and excessive pressures when one
the vertical and why? branch is discharging and the other isn’t are
possible


What are the slopes of pipe inside 1/4 in per foot for 3 in and smaller 1/8 in per foot for
the building that correspond to 2 fps larger pipe all elbows, taps, tees etc are tapped at
velocity? a pitch of 1/4” per foot


Where should cleanouts be 1) Inside or outside the building at the point of exit
provided? (use a wye branch) 2) at every change in direction
greater than 45 degrees 3) every 50 feet for piping
4” and less, and 100 ft for larger piping 4)
underground piping larger than 10 in should be
provided with manholes at every change in
direction and every 150 feet 5) at the base of all
stacks 6) as required by code


What size cleanouts are provided in Piping up to 4 inches, the cleanout is the same size
piping? as the pipe. Piping greater than 4 inches, 4 inch
cleanouts are adequate.


What should be installed in the A backwater valve or a combination BWV with
house drain if there is a danger of manually operated gate valve. The BWV does not
backflow of sewage into the interfere with the airflow throughout the system,
building? Whats the difference? and the gate valve is recommended where there is
a history of backflow as a positive means of
protection.


https://quizlet.com/1159643988/aspe-cpd-study-questions-ah-exam-complete-test-practice-questions-verified-answer-key-and-study-guide-for-latest-… 2/57

,3/24/26, 8:12 AM ASPE CPD Study Questions AH Exam Complete Test , Practice Questions, Verified Answer Key, and Study Guide for (Latest 2026 …



Branch connections to the house At the upper portion of the pipe (above the 1/2 -
drain should be made where and 2/3 full mark) because: 1) there is a lower chance of
why? stoppages in the branch 2) there is less flow
interference at the point of connection 3) When
there is no flow in the branch, the full area of the
pipe is available to relieve pneumatic pressure
fluctuations in the house drain


How many fixture units are 2 FUs, sump pumps, ejectors, air conditioning
equivalent to 1 gpm continuous or equipment, water cooled, equipment, etc
semicontinuous flow and what are
examples of these types of flow?


What minimum slopes are required 3 in pipe and smaller: 1/4 in/ft 4-6 in pipe: 1/8 in/ft 8
for building drains and why? in pipe and larger: 1/16 in/ft to maintain 2 fps
scouring action if low flow fixtures are present, 1/4
in/ft for all is a good idea


House drains are designed to flow 1/2 full to 3/4 full max under uniform flow
how full? conditions


What is a house (building) drain? The lowest piping of a gravity drainage system that
receives the discharge from soil, waste, and other
drainage pipes inside the building that extends a
short distance from the building and conveys the
drainage to the building sewer


What is the measurement from 45 degrees
horizontal that separates horizontal
and vertical drainage stacks?


Does an interior drainage stack that No. Any more than a 45 degree offset requires
offsets 45 degrees or less from the sizing the offset as a house drain.
vertical require a change in size?

https://quizlet.com/1159643988/aspe-cpd-study-questions-ah-exam-complete-test-practice-questions-verified-answer-key-and-study-guide-for-latest-… 3/57

, 3/24/26, 8:12 AM ASPE CPD Study Questions AH Exam Complete Test , Practice Questions, Verified Answer Key, and Study Guide for (Latest 2026 …



What is a branch interval? A building story or a distance between two branch
connections greater than 8 feet apart.


Describe the procedure for sizing 1) First size the horizontal branches connecting to
interior drainage stacks. the stack 2) Determine the minimum size that will
accept each branch at one branch interval 3) Total
all fixture units connected to the stack, and
determine the size. The minimum size must be at
least equal to the largest diameter required at the
base. You may reduce in size at upper branch
intervals, but never by more than 1/2 the largest
size.


What is the total recommended 7/24 of the total cross sectional area of the stack.
maximum permissible flow in a
stack?


Where should and shouldn’t you Not to the horizontal offset to the stack if at all
connect branch connections to stack possible, unless its at least 10 pipe diameters
offsets? downstream, and ideally 2 feet above the offset or
2 feet below to avoid pressure fluctuations.


What can minimize hydraulic jump? Increasing the slope of the horizontal drain.
Connecting to a horizontal drain that is larger than
the stack.


Any offset of the stack greater than 45 degrees
what can cause hydraulic jump?


When does terminal velocity occur in It is achieved at approximately 10 - 15 fps and this
a drainage stack? velocity is achieved within 10 - 15 feet of fall from
the point of entry.




https://quizlet.com/1159643988/aspe-cpd-study-questions-ah-exam-complete-test-practice-questions-verified-answer-key-and-study-guide-for-latest-… 4/57

Geschreven voor

Instelling
ASPE CPD
Vak
ASPE CPD

Documentinformatie

Geüpload op
24 maart 2026
Aantal pagina's
57
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
prettyace45 Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
3009
Lid sinds
1 jaar
Aantal volgers
10
Documenten
1527
Laatst verkocht
18 uur geleden

4.9

349 beoordelingen

5
319
4
19
3
5
2
1
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen