Correct & 100% Verified Answers |Updated to Pass
1. True or False? Some of the most important
True
things to review when preparing for a solar panel
installation job are the building permits
2. The low end of a rafter will be physically closer to which Soflt
of the following parts of the roof?
3. When the solar panel equipment arrives on site, which Mounting
hardware
items need to be stored close to the work area
because they will be installed first.
4. Ladders used to access a roof must extend at least how 36" (3')
far above the surface of the roof?
5. For electrical safety how many feet of clearance is need 3' (36")
for most PV equipment?
6. When preparing to install a QuickMountPV 1/4"
anchor from Unirac what size pilot hole
should be drilled to get the anchor bolt or
screw started?
NEC Section 690.35
7. The use of PV wire and cable as conductors
of PV electricity is addressed in
8. When marking rafters remember that their edge is less 2" thick
than
9. When splicing beams using CLICKSYStm beams 10. UNIRAC
and attachments from UNIRAC the nuts and beams
bolts should be tightened to should be
installed
1/
9
, NABCEP: System Installation and Inspection Module 4 Test with all
Correct & 100% Verified Answers |Updated to Pass
in spans not to exceed 10 ft. lbs.
36"
2/
9