JCIDS document gatekeeper
Give this one a try later!
J-8/Deputy Director for Requirements (DDR)
What does the Technology Maturation and Risk Reduction Phase demonstrate?
Give this one a try later!
Demonstrates critical technologies and prototypes.
Completes Preliminary Design
,What defines an Urgent Threat?
Give this one a try later!
Compelling need to prevent loss of life and/or mission failure during
current operations. Require little tech development and can be resolved in
<2 years.
How does DoD categorize technology maturity?
Give this one a try later!
Technology Readiness Levels (TRLs) are the way DoD has chosen to
categorize a program's
technology maturity
What happens at MS A?
Give this one a try later!
MDA approves Acquisition Strategy; determines release of TMRR RFP and
exit criteria for TMRR phase
What is the Focal Point, Driver and Output for the JCIDS
Give this one a try later!
, Focal Point: VCJCS (Vice Chairman of the Joint Chiefs of Staff)
Driver: Capability Needs
Output: Requirements
Pre-MDD User Needs
Give this one a try later!
JCIDS Capabilities-Based Assessment (CBA) leading to an Initial
Capabilities Document (ICD)
DoD 5000.02 Rev 3
Give this one a try later!
Removes Defense Business Systems (DBS) [moved to 5000.75]
- Replaces Rapid Fielding Capability with Urgent Capability Acquisition
- Adds specific PM guidance
- Adds Cybersecurity
Objective
Give this one a try later!
desired operational goal
, Pre-MDD Technology Opportunities
Give this one a try later!
- All sources foreign and domestic
- SBIR
- S&T activities
- ATDs
- JCTDs
- Joint Warfighting Experiments
What defines an Emergent Threat?
Give this one a try later!
Supports accelerated acquisition of capabilities needed for an anticipated
or pending contingency operation.
What are the three parameters of the Net-Ready KPP?
Give this one a try later!
Attribute 1. Supports military operations:
Attribute 2. Is entered and managed on the network
Attribute 3. Effectively exchanges information
What is the DoD Information Network (DoDIN)?
Give this one a try later!
J-8/Deputy Director for Requirements (DDR)
What does the Technology Maturation and Risk Reduction Phase demonstrate?
Give this one a try later!
Demonstrates critical technologies and prototypes.
Completes Preliminary Design
,What defines an Urgent Threat?
Give this one a try later!
Compelling need to prevent loss of life and/or mission failure during
current operations. Require little tech development and can be resolved in
<2 years.
How does DoD categorize technology maturity?
Give this one a try later!
Technology Readiness Levels (TRLs) are the way DoD has chosen to
categorize a program's
technology maturity
What happens at MS A?
Give this one a try later!
MDA approves Acquisition Strategy; determines release of TMRR RFP and
exit criteria for TMRR phase
What is the Focal Point, Driver and Output for the JCIDS
Give this one a try later!
, Focal Point: VCJCS (Vice Chairman of the Joint Chiefs of Staff)
Driver: Capability Needs
Output: Requirements
Pre-MDD User Needs
Give this one a try later!
JCIDS Capabilities-Based Assessment (CBA) leading to an Initial
Capabilities Document (ICD)
DoD 5000.02 Rev 3
Give this one a try later!
Removes Defense Business Systems (DBS) [moved to 5000.75]
- Replaces Rapid Fielding Capability with Urgent Capability Acquisition
- Adds specific PM guidance
- Adds Cybersecurity
Objective
Give this one a try later!
desired operational goal
, Pre-MDD Technology Opportunities
Give this one a try later!
- All sources foreign and domestic
- SBIR
- S&T activities
- ATDs
- JCTDs
- Joint Warfighting Experiments
What defines an Emergent Threat?
Give this one a try later!
Supports accelerated acquisition of capabilities needed for an anticipated
or pending contingency operation.
What are the three parameters of the Net-Ready KPP?
Give this one a try later!
Attribute 1. Supports military operations:
Attribute 2. Is entered and managed on the network
Attribute 3. Effectively exchanges information
What is the DoD Information Network (DoDIN)?