EPA Lead Supervisor Exam Actual Complete Real
Verified Exam Questions And Correct Answers
(Verified Answers) Already Graded A+||Newest Exam!!
When conducting personal air sampling for exposure
assessments use a flow rate of between___to___liters per
minute. - Answer-1 to 4
replacement soil used for backfill after soil removal can
contain no more than ______ppm lead content. - Answer-
200ppm
if you use a negative pressure enclosure for lead
abatement how many air changes per hour are
recommended under the HUD Guidelines. - Answer-10
When can a individual who is certified a lead supervisor
conduct clearance sampling on their own abatement
projects? - Answer-Never -conflict of interest
Waste-water from lead abatement activities can be
released into a sanitary sewer if filtered down to ____. -
Answer-10 micron
,2|Page
In California a certified Supervisor can conduct a dust-
wipe clearance as long as it is not a project where he
conducted abatement-T-F - Answer-False
Quantitative fit testing is required for respirators used in
environments that exceed 10 times the PEL-T-F - Answer-
True
Clearance levels for floors are ____ug/ft - Answer-<10
You are supposed to stamp or stencil enclosed surfaces
with lead warnings every______feet. - Answer-2 feet
Lead waste that fails the TCLP test is considered RCRA
hazardous waste -T-F - Answer-True
If an employees air monitoring shows results above the
Action Level but below the PEL the air monitoring must be
conducted every____months. - Answer-6
,3|Page
Paint strippers using methylene chloride are banned for
use under the HUD Guidelines-T-F - Answer-False
Trigger Task II work must be started in a
_________respirator if no exposure assessment has been
made. - Answer-Full Face
Work conducted under the CDPH Title 17 must comply
with which version of the HUD Guidelines? - Answer-1995-
Inspection use the 1997 revisions
When conducting personal air sampling for lead it is
acceptable to use a 37 mm MCEF cassette -T-F - Answer-
True
Household generated lead waste can be disposed of as
non- hazards waste-T-F - Answer-True
The 8551 notice must be posted 10 days prior to start of
abatement -T-F - Answer-False -5 days
ZPP testing reflects lead exposure within the
last____to___months - Answer-3 to 4 months
, 4|Page
Dust wipe sampling can be conducted on all but which of
the following 1.Carpeted 2.Window-sills 3.Window troughs
4.Walls - Answer-Walls
Lead waist that fails the TCLP is considered RCRA hazard
waist -True or false ? - Answer-True
N,R or P100 respirator cartridges are acceptable for lead
related work-T or F - Answer-True
CDPH requires a lead abatement plan when conducting
paint film stabilization-T or F - Answer-False
Final clearance would be required for permanent
abatement in public buildings-T or F - Answer-True
Waste Characterization can include three
steps:____,STLC and TCLP - Answer-TTLC
Clearance criteria for exterior horizontal surfaces is
______ug/ft - Answer-<400