You are inspecting a construction site and notice that
temporary erosion and sediment controls are not properly
installed. What are the potential consequences of this
issue?
a. Delays in the construction schedule
b. Increased construction costs
c. Environmental damage
d. All of the above - ANSWERS-d. All of the above
You are asked to identify the properties of sand. Which of
the following is NOT a property of sand?
,a. It has a low bearing capacity
b. It is highly porous
c. It has a low water retention capacity
d. It is difficult to compact - ANSWERS-d. It is difficult to
compact
ou are inspecting the placement of a subgrade and notice
that the finish tolerances are not being met. What are the
potential consequences of this issue?
a. Delays in the construction schedule
b. Increased construction costs
c. Poor road performance
d. All of the above - ANSWERS-d. All of the above
You are asked to identify the properties of gravel. Which of
the following is NOT a property of gravel?
a. It has a high bearing capacity
b. It is highly porous
c. It has a high water retention capacity
d. It is easy to compact - ANSWERS-c. It has a high water
retention capacity
,You are inspecting the placement of an embankment and
notice that the finish tolerances are not being met. What
should you do?
a. Accept the work and move on
b. Notify the project manager and request that the finish
tolerances be corrected
c. Issue a stop work order until the finish tolerances can be
corrected
d. Document the issue in the construction logs and move on
- ANSWERS-b. Notify the project manager and request that
the finish tolerances be corrected
You are inspecting the placement of an aggregate subbase
and notice that the compaction is below the required
specification. What should you do?
a. Accept the work and move on
b. Notify the project manager and request that the
compaction be corrected
c. Issue a stop work order until the compaction can be
corrected
d. Document the issue in the construction logs and move on
- ANSWERS-b. Notify the project manager and request that
the compaction be corrected
, You are asked to identify the properties of loam. Which of
the following is NOT a property of loam?
a. It has a high bearing capacity
b. It is highly porous
c. It has a high water retention capacity
d. It is easy to compact - ANSWERS-b. It is highly porous
You are inspecting the placement of a subgrade and notice
that the grading is not to the specified slope. What are the
potential consequences of this issue?
a. Delays in the construction schedule
b. Increased construction costs
c. Poor road performance
d. All of the above - ANSWERS-d. All of the above
What should be inspected before placing asphalt?
A) The application of tack coats
B) The delivery, placement, compaction, and finishing of
asphalt
C) Preplacement inspection, including grade control,
equipment pre-checks, and paving plan review