Class A Lineman Test | UESTIONS AND ANSWERS
| LATEST UPDATE
Save
Practice questions for this set
Learn 1/7 Study using Learn
5 ft
Choose an answer
On a service can we install a meter When installing a service what
1 2
with load present ? connection is made first ?
How close can you get to energized On a viper recloser what does single
3 primary voltage before gloves and 4 phase trip , single phase lockout
sleeves are required ? mean ?
Don't know?
Terms in this set (73)
, On a service can we install a meter No
with load present ?
Is special precautions part of a Yes
tailboard / job briefing ?
When can tools be modified ? Never
How often do you inspect your Before each use
rubber gloves and sleeves ?
On a viper recloser what does single Only the phase that is faulted will trip and recloser
phase trip , single phase lockout will only lockout that phase .
mean ?
What is the wench capacity shown 15000 lbs
on this load chart ?
Where would the service neutral Directly to the secondary ground bus
connection be made on wye / wye
120/208 bank ?
When facing the secondary side of Right
an additive polarity transformer ,
what side is the XI bushing on?
Can we run a service over a pool ? No
What is the minimun length gaffs can 1.25 in
be ?
| LATEST UPDATE
Save
Practice questions for this set
Learn 1/7 Study using Learn
5 ft
Choose an answer
On a service can we install a meter When installing a service what
1 2
with load present ? connection is made first ?
How close can you get to energized On a viper recloser what does single
3 primary voltage before gloves and 4 phase trip , single phase lockout
sleeves are required ? mean ?
Don't know?
Terms in this set (73)
, On a service can we install a meter No
with load present ?
Is special precautions part of a Yes
tailboard / job briefing ?
When can tools be modified ? Never
How often do you inspect your Before each use
rubber gloves and sleeves ?
On a viper recloser what does single Only the phase that is faulted will trip and recloser
phase trip , single phase lockout will only lockout that phase .
mean ?
What is the wench capacity shown 15000 lbs
on this load chart ?
Where would the service neutral Directly to the secondary ground bus
connection be made on wye / wye
120/208 bank ?
When facing the secondary side of Right
an additive polarity transformer ,
what side is the XI bushing on?
Can we run a service over a pool ? No
What is the minimun length gaffs can 1.25 in
be ?