VERIFIED QUESTIONS WITH ANSWERS
◉Which of the following construction activities is not covered under
the CGP:. Answer: Routine maintenance to maintain original line and
grade, hydraulic capacity, or original purpose of the facility
◉Conditions for Termination of Coverage. Answer: Within 90 Days
when construction is complete or ownership transferred File
through SMARTS
1. File NOT
2. Final Site Map
3. Photos
◉The NOT must demonstrate through.... Answer: A. 70% final cover
method
B. RUSLE or RUSLE2 method - computational proof required
C. Custom Method - Demonstrate in some other manner than A or B
that the site complies with final stabilization
, ◉Authorized non-storm water discharges may include those
from____. Answer: Dechlorinated potable water sources such as:
Fire Hydrant Flushing, Irrigation of Veg Erosion Control Measures,
Pipe Flushing/Testing, Dust Control, Uncontaminated ground water
from dewatering
◉What is the CGP-approved method for pH analysis?. Answer:
Calibrated field meter
◉Any person who violates any permit condition of the GP is subject
to a civil penalty not to exceed $____. Answer: $37,500 per calendar
year of such violation
◉pH and Turbidity parameter for Risk Level 2 & 3. Answer: pH - 6.5-
8.5
Turbidity - 250 NTU
◉When outside the pH and Turbidity parameters the discharger
shall..... Answer: Conduct a construction sure and run-on evaluation
to determine whether pollutant source(s) associated with the site's
construction activity may have caused or contributed to the NAL
exceedance and implement corrective actions