◉Non-Stormwater reports are to be documented. Answer: Quarterly
◉Annual reports are due each year by. Answer: September 1st
◉Unless otherwise noted, SWPPP documents are to be retained for.
Answer: 3 years
◉Annual reports must contain all except. Answer: Inspection
photographs from LUP projects
◉Which entity is tasked to obtain and retain a printed copy of
forecast information from the National Weather Service?. Answer:
QSP
◉Which of the following two factors are primary for making a risk
determination. Answer: Receiving Waters and Sediment Risk
, ◉Under the CGP, a project's hydromodification requirements are
superseded by. Answer: A local SWMP
◉Which hydrological soil group has the highest infiltration rate?.
Answer: A - Sand
◉Water balance (hydromodification) requirements are intended to
manage pre-project storm volumes up to the ____ percentile. Answer:
85th
◉Bioassessment exemptions may be allowed for projects in
ecoregions with an index period that is. Answer: Outside of
construction commencement
◉Bioassessment protocols used on Level 3 projects must follow
those found in. Answer: SWAMP
◉Amendments to the SWPPP are the responsibility of the. Answer:
QSD
◉All linear project SWPPPs must be developed to. Answer: include
Narrative BMPs which may or may not be drawn on a BMP map