1. A contractor is installing a new 4-inch water service line from the city main to a
commercial building. The tap must be made on a ductile iron water main that is under
pressure. According to NC regulations, what is the primary requirement for making this
connection?
a) A corporation stop must be installed using a tapping machine while the main is under
pressure.
b) The main must be shut down and drained completely before any connection is
attempted.
c) A saddle clamp can be used without a tapping machine if the main is less than 6
inches in diameter.
d) The connection must be made with a PVC saddle and a hand drill.
Correct Answer: a) A corporation stop must be installed using a tapping machine
while the main is under pressure.
Rationale: NC public utilities standards, consistent with industry best practices, allow for
"wet taps" on pressurized mains using a tapping machine. This method installs a
corporation stop (corp stop) that seals the connection, allowing the main to remain in
service, which is critical for public water supply continuity. Shutting down a main (b)
requires extensive notification, dewatering, and can disrupt service to a large area.
,Saddle clamps (c) may be used but still require a tapping machine for a pressurized
connection. Using a PVC saddle and hand drill (d) is unsafe and not permitted on a live
main due to the risk of blowout and inability to control the tap.
2. You are backfilling a trench for a new sanitary sewer line in North Carolina. The pipe is
8-inch PVC. What is the most critical factor regarding the backfill material immediately
surrounding the pipe (the "haunch" and "initial backfill")?
a) The material must be the native soil excavated from the trench to ensure
compatibility.
b) The material must be free of rocks, large clumps, and debris to prevent point loading
and pipe deflection.
c) The material must be 100% compacted sand to provide a rigid support system.
d) The material type is irrelevant as long as the final grade is achieved with a vibratory
roller.
Correct Answer: b) The material must be free of rocks, large clumps, and debris to
prevent point loading and pipe deflection.
Rationale: The zone from the pipe bedding up to the springline (the haunch and initial
backfill) is critical for pipe support. Material containing rocks or debris can create point
loads that damage the pipe, especially PVC, leading to cracks or excessive deflection.
While native soil can often be used if properly screened (a), the defining requirement is
that it is free of deleterious materials. While sand (c) is an excellent bedding material, it
is not a strict requirement for all applications if the native soil is suitable and compacted
correctly. The final grade and compaction (d) are important, but the material
immediately surrounding the pipe is paramount for the pipe's structural integrity.
3. A North Carolina Public Utilities contractor is performing a hydrostatic pressure test
on a new water main. What is the minimum test pressure and duration typically required
for a new ductile iron pipe system?
a) 100 psi for 1 hour
b) 150 psi for 2 hours
,c) 200 psi for 4 hours
d) The system must be tested to 1.5 times the maximum working pressure for a
minimum of 2 hours.
Correct Answer: d) The system must be tested to 1.5 times the maximum working
pressure for a minimum of 2 hours.
Rationale: NC Department of Environmental Quality (DEQ) and standard engineering
specifications require that new water mains be pressure tested to at least 1.5 times the
maximum operating pressure. The duration is typically a minimum of 2 hours, though
longer durations may be specified to ensure stability and to allow for the dissipation of
trapped air and temperature equalization. Options a, b, and c provide specific numbers
that are not universally applicable, as the test pressure is a factor of the designed
working pressure of the specific system.
4. When installing a fire hydrant in North Carolina, what is the standard orientation for
the hydrant's main valve opening relative to the water main?
a) The valve opening should face the main to minimize friction loss.
b) The valve opening should face the street to allow for easy access by fire departments.
c) The valve opening should be oriented perpendicular to the main.
d) The valve opening should face the nearest building to provide the shortest response
time.
Correct Answer: c) The valve opening should be oriented perpendicular to the
main.
Rationale: Standard practice and many NC municipal specifications require that the
hydrant's main valve (the "shoe") be installed so that the opening is perpendicular to the
water main. This orientation provides a straight, unobstructed flow path from the main
into the hydrant barrel and minimizes stress on the connection. It also ensures the
hydrant's breakaway flange is correctly positioned. Orientation towards the street (b) is a
common requirement for the hydrant's outlet orientation, not the main valve
connection.
, 5. A contractor is installing a gravity sanitary sewer line. What is the primary purpose of
performing a mandrel test on the installed pipe?
a) To verify the watertightness of the pipe joints.
b) To check the pipe for ovality or deflection that could restrict flow.
c) To confirm the pipe's resistance to external hydrostatic pressure.
d) To ensure the pipe material meets the specified crush strength.
Correct Answer: b) To check the pipe for ovality or deflection that could restrict
flow.
Rationale: A mandrel is a device that is pulled through a sewer line to verify that the
internal diameter has not been compromised due to improper bedding, haunching, or
backfilling. For flexible pipe like PVC, excessive deflection is a common problem. If the
mandrel does not pass, it indicates the pipe is deformed. This test is separate from a
leakage test (a) (air or water). Resistance to hydrostatic pressure (c) is related to the
pipe's structural design and joint integrity, but the mandrel test is specifically for shape.
Crush strength (d) is a material property, not something tested in the field with a
mandrel.
6. In North Carolina, who has the primary authority for permitting and inspecting the
installation of a new individual septic system (onsite wastewater system)?
a) The North Carolina Department of Transportation (NCDOT)
b) The local city or town building inspections department
c) The North Carolina Department of Environmental Quality (NC DEQ), typically through
the local County Health Department
d) The North Carolina State Board of Examiners of Plumbing, Heating and Fire Sprinkler
Contractors
Correct Answer: c) The North Carolina Department of Environmental Quality (NC
DEQ), typically through the local County Health Department.
Rationale: Authority for onsite wastewater systems (septic systems) is delegated by NC