Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CET 440 Final Exam Review Questions With Correct Answers

Beoordeling
-
Verkocht
-
Pagina's
6
Cijfer
A+
Geüpload op
27-03-2026
Geschreven in
2025/2026

CET 440 Final Exam Review Questions With Correct Answers...

Instelling
CET 440
Vak
CET 440

Voorbeeld van de inhoud

CET 440 Final Exam Review Questions
With Correct Answers

Contractors are resource managers, their most important resource is
equipment.

True or False? - ANSWER False (labor force is most important resource)

Once the Lawsuit is filed, direct communications between the disputing parties
are essentially brought to an end, with dialogue being confined to the:

a. Owner b. General contractor c. Lawyer d. Engineer - ANSWER c) Lawyer

In labor relation terms, the meaning of Minority Business Enterprise (MBE) is a
business that at least ________ owned and managed by minority group member.

a. 90% b. 70% c. 50% d. 30% - ANSWER c) 50%

For bid documents, usually the design plan set is included in Project Manual.

True or False - ANSWER False (design plan separate)

The fact-finding stage in the litigation, will assure both disputing parties that no
surprises are going to be presented in the:

a. Courtroom b. Job-site office c. Bid opening room d. Final inspection -
ANSWER a) Courtroom

In a conflict between the terms of the general contract and the subcontract
agreement, the more specific one, which is the subcontract agreement, will be
governed.

True or False - ANSWER True

In the international construction projects, the last payment is generally
authorized upon:

a. final completion b. substantial completion c. end of warranty period d. all of
the above - ANSWER b) substantial completion

Liquidated Damages is the charge in $/Day for the number of days the
contractor needs to finish a project beyond the contract award date.

, True or False - ANSWER False (liquidated damages applied when contractor
does not perform work within construction period)

All Changes that made by the owner or the contractor and impacts the contract
price and/or the contract time shall be formalized in _______.

a. an Addendum b. a small contract c. a Change Order d. the Bid package -
ANSWER c) Change order

In ethics management, moral often related to practices within a provision, while
ethics is related to a norm in a society.

True or False - ANSWER False (moral is related to norms)

Change Order is an adjustment made to the original contract and must satisfy all
the prerequisites of the original.

True or False - ANSWER True

If the contractor performs the work requested in the change order without
protesting, a later claim by the contactor that the change was cardinal will not
be accepted.

True or False - ANSWER False (should be addressed at the beginning)

Calendar days are preferred when time extension, such as those resulting from
adverse weather or owner-caused delays, are not generally anticipated.

True or False - ANSWER True

Patent defects continue to be the responsibility of the contractor even after the
acceptance of the project.

True or False - ANSWER False (once contract accepted patent defects no longer
responsibility)

Contractors generally do not have the right to file mechanic's lien when working
as a general contractor.

True or False - ANSWER False

As far as International Construction contracts, the US Firms have been most
successful in providing design services.

True or False - ANSWER True

Geschreven voor

Instelling
CET 440
Vak
CET 440

Documentinformatie

Geüpload op
27 maart 2026
Aantal pagina's
6
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$17.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Zayla Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
112
Lid sinds
3 jaar
Aantal volgers
13
Documenten
14218
Laatst verkocht
1 week geleden

3.4

17 beoordelingen

5
5
4
3
3
5
2
2
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen