▶ Networking. Answer: Act or process of expanding your professional
connections
▶ Effective. Answer: successful in producing a desired or intended result
▶ Efficient. Answer: achieving maximum productivity with minimum wasted
effort or expense
▶ Project. Answer: Fixed time frame, temporary, specific pre-defined
purpose, distinct results, high risk, multi step, requires others,
interconnected tasks
▶ Task. Answer: Ongoing time frame, more routine, limited risk, single
step, completed by one person
▶ Project owner. Answer: Person who initiates or sponsors the project and
defines high-level requirements
▶ Stakeholder. Answer: People impacted by outcome of project
▶ Deliverables. Answer: Specific, tangible outcomes produced as a result
of the project
▶ Scope. Answer: Goals and parameters of the project
▶ Project Success Factors. Answer: Was it completed?
On (or under) budget?
On time?
Did it meet the original goal or stated business objective?
, ▶ Stages of Project Management. Answer: Initiating, Planning, Executing,
Monitoring, Closing
▶ Precedent task. Answer: Must be completed before another task can be
done
▶ Dependent task. Answer: Can only be done after another task is
completed
▶ Concurrent task. Answer: A task that can be completed at the same
time as another task.
▶ Safety Margin. Answer: Additional time added to estimates to deal with
the unexpected (50%)
▶ Gnatt Chart. Answer: Visual representation of a project that illustrates a
variety of elements at a glance
▶ Switch Tasking. Answer: Rapidly switching from one task to another
▶ Background tasking. Answer: Tasks that can be done simultaneously
because one or both of them does not require mental effort
▶ Rapid refocus. Answer: Ability to focus fully on the task at hand and
then smoothly transition that concentration wholly to the next task
▶ Batching. Answer: Process of doing all items that are similar in nature in
one period of time to reduce ramp up and slow down time
▶ Time blocking. Answer: Marking time on the calendar to focus on one
specific item or a batch of items
▶ Parkinson's Law. Answer: work expands or contrasts to fill the time
available for its completion
▶ Systems. Answer: Existing processes by which tasks are completed
▶ Systems Components. Answer: Clear, consistent, correct, consensual,
concrete
QUESTIONS AND EXAM SCRIPT FULL
SOLUTION
▶ Networking. Answer: Act or process of expanding your professional
connections
▶ Effective. Answer: successful in producing a desired or intended result
▶ Efficient. Answer: achieving maximum productivity with minimum wasted
effort or expense
▶ Project. Answer: Fixed time frame, temporary, specific pre-defined
purpose, distinct results, high risk, multi step, requires others,
interconnected tasks
▶ Task. Answer: Ongoing time frame, more routine, limited risk, single
step, completed by one person
▶ Project owner. Answer: Person who initiates or sponsors the project and
defines high-level requirements
▶ Stakeholder. Answer: People impacted by outcome of project
▶ Deliverables. Answer: Specific, tangible outcomes produced as a result
of the project
▶ Scope. Answer: Goals and parameters of the project
▶ Project Success Factors. Answer: Was it completed?
On (or under) budget?
On time?
Did it meet the original goal or stated business objective?
, ▶ Stages of Project Management. Answer: Initiating, Planning, Executing,
Monitoring, Closing
▶ Precedent task. Answer: Must be completed before another task can be
done
▶ Dependent task. Answer: Can only be done after another task is
completed
▶ Concurrent task. Answer: A task that can be completed at the same
time as another task.
▶ Safety Margin. Answer: Additional time added to estimates to deal with
the unexpected (50%)
▶ Gnatt Chart. Answer: Visual representation of a project that illustrates a
variety of elements at a glance
▶ Switch Tasking. Answer: Rapidly switching from one task to another
▶ Background tasking. Answer: Tasks that can be done simultaneously
because one or both of them does not require mental effort
▶ Rapid refocus. Answer: Ability to focus fully on the task at hand and
then smoothly transition that concentration wholly to the next task
▶ Batching. Answer: Process of doing all items that are similar in nature in
one period of time to reduce ramp up and slow down time
▶ Time blocking. Answer: Marking time on the calendar to focus on one
specific item or a batch of items
▶ Parkinson's Law. Answer: work expands or contrasts to fill the time
available for its completion
▶ Systems. Answer: Existing processes by which tasks are completed
▶ Systems Components. Answer: Clear, consistent, correct, consensual,
concrete