VSMP authorities or its designee must perform post construction
inspections every
Choose an answer
1 10 years 2 5 years
3 8 years 4 2 years
Don't know?
Terms in this set (114)
, The Virginia Stormwater Virginia Stormwater Management Act, Virginia
Management Program is authorized Stormwater Management Program Regulation
by the ______ and administered
through the ______
VPDES Permit/Construction GP greater than or equal to an acre
authorizes discharge of stormwater
from construction activities that are
The Stormwater Management Act permit, regulate, and control stormwater runoff
requires the State Water Control
Board to
DEQ has ___ days to complete 90
review of real or potential inter-
jurisdictional impacts upon request
The Stormwater Management Act staff of a stormwater program, anyone
requires the following individuals to contracted by a VSMP authority, standard and
obtain and maintain a certificate of specification holders
competency
The dual certificate will expire three the latest date of the certificates
years from
SWM plan must be approved by ___ VSMP program authority
before land disturbance
The water quality criteria sets a site- 0.41 lbs/acre/year
based load limit of ____ of total
phosphorus for new development
The phosphorus load limit uses the 10% impervious cover
Answers | Latest Already Graded A+ UPDATE
|2026
Save
Practice questions for this set
Learn 1 /7 Study with Learn
VSMP authorities or its designee must perform post construction
inspections every
Choose an answer
1 10 years 2 5 years
3 8 years 4 2 years
Don't know?
Terms in this set (114)
, The Virginia Stormwater Virginia Stormwater Management Act, Virginia
Management Program is authorized Stormwater Management Program Regulation
by the ______ and administered
through the ______
VPDES Permit/Construction GP greater than or equal to an acre
authorizes discharge of stormwater
from construction activities that are
The Stormwater Management Act permit, regulate, and control stormwater runoff
requires the State Water Control
Board to
DEQ has ___ days to complete 90
review of real or potential inter-
jurisdictional impacts upon request
The Stormwater Management Act staff of a stormwater program, anyone
requires the following individuals to contracted by a VSMP authority, standard and
obtain and maintain a certificate of specification holders
competency
The dual certificate will expire three the latest date of the certificates
years from
SWM plan must be approved by ___ VSMP program authority
before land disturbance
The water quality criteria sets a site- 0.41 lbs/acre/year
based load limit of ____ of total
phosphorus for new development
The phosphorus load limit uses the 10% impervious cover