The Good Housekeeping section of the SWPPP must include all BUT which of
the following:
1. Hazardous Waste Management and Disposal Procedures
2. Solid Waste Management and Disposal Procedures
3. Sanitary Waste Management and Disposal Procedures
4. Post Construction Stormwater Management Procedures
4. Post Construction Stormwater Management Procedures
Runoff Controls include all but which one of the following:
1. Rolled Erosion Control Products (RECPs)
2. Diversions
3. Check Dams
4. Slope Drains
1. Rolled Erosion Control Products (RECPs)
The stormwater Notice of Intent (NOI) must be submitted
After the SWPPP is prepared and before starting construction.
, Potential pollutant sources stored on a construction site may include:
1. Petroleum storage tanks
2. Soil amendments (e.g. fertilizer, lime, etc.)
3. Masonry materials
4. All of the above
4. All of the above
The SWPPP implementation sequence may be modified
After consulting with the project SWPPP designer (CEC) and if required the
Project Owner after receiving written approval.
A SWPPP Site Map will show all of the following except:
1. Locations and BMPs
2. Notices of Violation
3. Phasing and Sequence
4. Limits of Disturbance
2. Notices of Violation
Which of the following information is to be posted at the entrance to the site?
1. Construction Site Notice
2. Permit authorization
3. Location of the SWPPP
4. All of the above
4. All of the above