Inspector Exam Questions and
Correct Answers | Newest
Update 2026/2027 | Graded A+ |
100% Assured Pass
What are the types of disconnection allowed for rooftop disconnection? - 🧠
ANSWER ✔✔1) simple disconnection - rooftops and/or on-lot residential
impervious surfaces are directed to pervious areas
2) disconnection leading to an alternative runoff reduction practice adjacent
to the roof (ex: soil compost amended filter path)
,Why have a rooftop disconnection to an alternative practice? - 🧠 ANSWER
✔✔-lot size too small
-filter width is too narrow
-need more water quality credit
Functions provided by simple rooftop disconnection - 🧠 ANSWER ✔✔-
annual runoff volume reduction
-total phosphorus mass load removal
-total nitrogen mass load removal
Alternative rooftop disconnection types - 🧠 ANSWER ✔✔-soil compost-
amended filter path
-dry-well or french drain
-rain-garden//front yard bioretention
-rainwater harvesting//cistern
-stormwater planter
How does sheet flow to a vegetated filter strip or conserved open space
work? - 🧠 ANSWER ✔✔Filter strips are vegetated areas that treat sheet
,flow delivered from adjacent impervious and managed turd areas by
slowing runoff velocities and allowing sediment and attached pollutants to
settle and/or be filtered by the vegetation
Gravel diaphragm - 🧠 ANSWER ✔✔-pretreatment device
-maintains sheet flow
-not necessary if contributing drainage area is solely turf
-trench is 2 ft. wide and 1 ft. deep
-runs on same contour at top of filter strip
-drop at least 3 inches
-fabric between gravel and soil
Engineered level spreader - 🧠 ANSWER ✔✔-forebay: max. 3ft. deep,
transition to 1 ft. at level spreader lip
-level spreader lip - concrete, wood, or prefabricated metal, with a well
anchored footer, or other accepted rigid, non-erodible material
-location: 3-6 inches above downstream natural grade to avoid turf buildup
-3ft. of VDOT #3 stone, underlain by filter fabric just below spreader
-vegetated receiving area must be stabilized
COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2026. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED
, Construction sequence for conserved open space - 🧠 ANSWER ✔✔- no
clearing, grading, heavy equipment
-protect area during construction
-prevent sediment discharge
-mark limits of disturbance
-drainage area stabilized
-grade with tracked vehicles
-install gravel diaphragm and/or level spreader
-mark filter boundaries
-keep vehicles out
-stockpile topsoil for later use
-divert construction runoff
-install gravel diaphragm and/or level spreader
-grade with tracked vehicles
-open to runoff once stabilized