ACI- Concrete Flatwork
Finishing Exam 2026
Typical Project Specifications may contain requirements related to: (8 Things)—ANSWER--
Material Properties
Concrete Strength and Durability
Mix Proportions
Vapor Retarders or barriers
Reinforcement
Slab flatness and levelness
Joint Spacing and depth
Curing and protection
Concrete delivery rate should be matched to:—ANSWER--the placing equipment and
production capabilities of the finishing crew
How can placement delays affect concrete—ANSWER--Placement delays can affect the
concrete's properties
, Schedules and economics typically dictate daily concrete placement of—ANSWER--10-
20,000 ft^2
A laser-guided, wheel mounted screed can increase daily placements to—ANSWER--30-
50,000 ft^2
Concrete is sold in—ANSWER--cubic yards by volume
Checklist for ordering concrete (6 things)—ANSWER--Volume
Who is ordering
Where to deliver
When to Deliver
Delivery Rate
Mix properties
Concrete must be completely discharged within—ANSWER--90 minutes or 300 revolutions of
drum
Where can you find the time that the concrete was loaded—ANSWER--Truck drivers batch
ticket
Average Production Rate for a- walk behind power trowel—ANSWER--1000-3000 ft^2 daily
Average Production Rate for a Ride on Trowel—ANSWER--3000-6000 ft^2 daily
Average Production Rate for a Laser guided wheel mounted screed—ANSWER--30,000-
50,000 ft^2 daily
© 2026 Copyright. All Rights Reserved. This document is
protected by copyright law, Copyrighted By Brittie Donald
Finishing Exam 2026
Typical Project Specifications may contain requirements related to: (8 Things)—ANSWER--
Material Properties
Concrete Strength and Durability
Mix Proportions
Vapor Retarders or barriers
Reinforcement
Slab flatness and levelness
Joint Spacing and depth
Curing and protection
Concrete delivery rate should be matched to:—ANSWER--the placing equipment and
production capabilities of the finishing crew
How can placement delays affect concrete—ANSWER--Placement delays can affect the
concrete's properties
, Schedules and economics typically dictate daily concrete placement of—ANSWER--10-
20,000 ft^2
A laser-guided, wheel mounted screed can increase daily placements to—ANSWER--30-
50,000 ft^2
Concrete is sold in—ANSWER--cubic yards by volume
Checklist for ordering concrete (6 things)—ANSWER--Volume
Who is ordering
Where to deliver
When to Deliver
Delivery Rate
Mix properties
Concrete must be completely discharged within—ANSWER--90 minutes or 300 revolutions of
drum
Where can you find the time that the concrete was loaded—ANSWER--Truck drivers batch
ticket
Average Production Rate for a- walk behind power trowel—ANSWER--1000-3000 ft^2 daily
Average Production Rate for a Ride on Trowel—ANSWER--3000-6000 ft^2 daily
Average Production Rate for a Laser guided wheel mounted screed—ANSWER--30,000-
50,000 ft^2 daily