Verified Answers |Latest Version |Already Graded A+
How does a 2 Point Perspective drawing differs from a One Point Perspective? ✔Correct Answer-
The viewer's point of view is at eye level and is NOT perpendicular to any of the objects' planes
In a __, the viewer's line of sight is at normal eye level and is not perpendicular to any of the objects
planes. ✔Correct Answer-two point perspective
The primary advantage of an oblique drawing is that... ✔Correct Answer-existing orthographic
drawings can be used as a starting point
__ is one that has one of its planes parallel to the picture plane so an existing floor plan or elevation
can be used as the starting point. ✔Correct Answer-oblique drawing
A graphic indication showing which lights and outlets are connects to a particular circuit breaker in
an electrical panel box ✔Correct Answer-home run noted on the contract document
If a cable is continuously from the electrical panel to the device, without any intermediate
connections, it is considered a ✔Correct Answer-home run
Where in the construction drawings would you find a drawing that shows the assembly of a custom
designed illuminated ceiling? ✔Correct Answer-detail page
A building or interior design project is a complex collection of component parts, all of which are
connected to other parts in various ways. The manner in which an assembly of several parts is
organized and connected is commonly referred to as a ✔Correct Answer-detail
see concrete symbol ✔Correct Answer-*
Your client has an account for special pricing with a particular manufacturer.
However, they are unsure if the product they are getting is the best price they can receive for the
same level of product.
What type of specification would be best to include in the bid documents to ensure your client's
concerns are addressed? ✔Correct Answer-base bid specification
spec is a type of prescriptive spec and basically an expanded proprietary spec, it ensures the designer
truly understands the differences as well as the concerns of the client. ✔Correct Answer-base bid
The first purpose is basic; they are simply a way of fitting the large components together. In this role,
details resolve problems of connection and transition.
The second purpose is to solve functional problems.
The third purpose is to enhance the intent of the overall design concept. ✔Correct Answer-3
purposes of a detail
The color palette used is part of the overall idea of how the designer will approach meeting those
functional needs through... ✔Correct Answer-design concept
, the work or business process proceeds from one location to another in a strict sequence. ✔Correct
Answer-linear workflow
the work is controlled from one central position. ✔Correct Answer-centralized workflow
is hierarchical, typically with one group controlling work divided into separate departments.
✔Correct Answer-departmental workflow
If an occupant of a building is experiencing a variety of health-related symptoms that cannot be
directly linked to a particular cause, what might they be suffering from? ✔Correct Answer-sick
building syndrome
symptoms can be directly attributed to certain building contaminants. ✔Correct Answer-building
related illness
is a condition brought on by exposure to VOCs or other chemicals. ✔Correct Answer-multiple
chemical sensitivity
A project seeking LEED Certification needs a minimum number of credits under Building product
disclosure and optimization — sourcing of raw materials, which gives preference for bio-based
renewable materials.
Which of the following materials should the designer reselect? (marble flooring, bamboo flooring,
wheatgrass cabinets, cotton batt insulation) ✔Correct Answer-marble flooring
Standard height wall outlets are __ above the finished floor. ✔Correct Answer-15"
For Practicum Per NCIDQ Examination Building Codes, 7.1 ALL electrical receptacles MUST be __ AFF
unless otherwise noted. ✔Correct Answer-18"
When selecting lighting fixtures, which brightness ratio is considered acceptable in a commercial
office space between the task and general surroundings? ✔Correct Answer-5:1
between task and immediate surrounding (for example, between a piece of paper and the desktop)
✔Correct Answer-3:1
between the task and more remote surroundings. ✔Correct Answer-10:1
Doors are classified according to: __, or how they open and close ✔Correct Answer-method of
operation
measures all elements in a room including furniture, partitions, ceiling, sound masking systems, etc.
✔Correct Answer-articulation class
Which measurement is best for rating speech privacy in an open office? ✔Correct Answer-
articulation index
relates to building components and their effect on hearing and sound isolation ✔Correct Answer-
STC
considers the performance of all the elements in the space working together, including: