What element is targeted by water quality criteria? -
ANSWER-Phosphorous, it indicates pollution by bonding
with other pollutants.
How many days does DEQ have to complete review of
real or potential inter-jurisdicitonal impacts upon request? -
ANSWER-90 days
,Who is required to maintain a certificate of competency by
the Stormwater Management Act? - ANSWER-staff of a
stormwater program, anyone contracted by a VSMP
authority, and all standard and specification holders
A SWM Plan must be approved by who prior to land
disturbance? - ANSWER-the VSMP Program Authority
What is the TP limit for a site? - ANSWER-0.41 lbs/ac/yr
The phosphorus load limit uses what % impervious cover?
- ANSWER-10%
, Part II B and II C water quantity criteria addresses: -
ANSWER-channel protection and flood protection
Of all the plans included in the SWPPP, which two must be
approved? - ANSWER-the SWM and ESC Plans
Does a SWM plan address runoff during or after
construction? - ANSWER-post-construction
What is the lower limit of imperviousness which could
result in stream degradation? - ANSWER-10%
If land disturbance occurs as a result of emergency work,
what is the timeline for advising the VSMP authority of the