Answers, 100% Verified Graded A+
1. LDP
Answer: Land Developing Projects - altering landscape for projects such as agriculture or housing ect.
2. NPDES
Answer: National Pollutant Discharge Elimination System
- section of the CWA (Clean Water Act) to permit stormwater discharges associated w industrial activities PER permit
3. CWA Penalty Types
Answer: Adminstrative Class I. Neglegent
Class II. Knowlingly = greater fines
4. What documents are required on site?
Answer: - SWPPP
- CGP
- Site Map
,- Drawings and Key
- All inspection reports
- Any amendments to SWPPP
5. Who is the "operator"? Also the LRP.
Answer: Usually the OWNER of the site, not the contractor, unless authorized by the owner to general contractor to
have day-to-day operational control!
6. When do you need permit coverage?
Answer: Required from start to end of project. "End" being the final vegetative/non-vegetative (concrete) stabilization
occuring.
For any project one acre or greater.
7. Large Land Development
Answer: -strips ott all existing vegetation a.k.a site carving
-usually on hillsides and steep slopes
-installation of untilities that tear up large areas of land
8. Vertical Projects
Answer: - Homebuilding, smaller residence construction projects
-usually multiple subcontractors
, -requires lots of housekeeping = mass choas
9. Bix Box Projects
Answer: -commercial buildings
-mass grading and mass choas
-highly visible w/ fairly large footprint
10. Linear Projects
Answer: -roadways, utilities, and stream corridors
-long narrow sites and mass choas
-limites site access and continually changing (high activity)
11. What is erosion?
Answer: The process by which soil particle get displaced by the act of wind of water.
12. What are the three types of Wind Erosion?
Answer: 1.Creep-causessanddunes
<10%
-large particle that roll across a terrain
2. Saltation - bouncing particles that DISLODGE more particles, then fall back down