Familiarization QUESTIONS WITH
CORRECT DETAILED ANSWERS ||
GUARANTEED PASS
1. Which is NOT a common mistake when submitting an ESSP? - ANSWER
✅ Sending the ESSP to USATCES
2. Your facility does not have a lightening protection system (LPS). Which of
these will you have to submit? - ANSWER ✅ Risk Assessment and
command acceptance of the risk
3. Who is authorized to sign an ESSP transmittal memorandum? - ANSWER
✅ Installation Commander or designated representative
4. Which ESSP category addresses PES and ES that do not meet the
deterministic QD criteria, but do meet DDESB-approved, risk-based siting
acceptance criteria? - ANSWER ✅ RBSB
5. Your installation is refurbishing an existing PES facility built in 1968. Do
you need to complete an ESSP? - ANSWER ✅ Yes, and it requires DDESB
approval.
6. Intraline distance (ILD) is the minimum distance permitted between... -
ANSWER ✅ two operating buildings.