4 ply built up roof would have? - ✔✔✔-4 layers of felt and 4 layers of bitumen
A ___________ flue lining is suitable for wood-burning, gas and oil applications. - ✔✔✔-
Stainless Steel
A "hammer test" test is important _____. - ✔✔✔-To see if bolts are tight
A 30 amp plug fuse is usually what color? - ✔✔✔-Green
A built up roof having a lap joint every 12" has how many plys? - ✔✔✔-3 ply
A copper to steel connection undergoes a/an? - ✔✔✔-Electrolytic Reaction
A dirty air filter can cause? - ✔✔✔-Reduced air flow and lower return air temperature
A fireplace hearth should extend beyond the front of the fireplace by at least _____ inches. -
✔✔✔-16
A forced-air heating system that is fueled by oil is evidenced by the presence of a ___________.
- ✔✔✔-barometric damper
A home inspector will typically find the ______-port burners installed in a furnace with a forced-
draft, as they are common with high-efficiency furnaces. - ✔✔✔-Mono
A joist below and parallel to a bearing wall should be ___________. - ✔✔✔-doubled
A kitchen split-receptacle is a ____________. - ✔✔✔-duplex receptacle whose top and bottom
halves are on individual dedicated circuits
, Home Inspector Florida Test Practice Questions and Answers – 100% Updated
A load-bearing stud wall has a ____________. - ✔✔✔-double top plate and a single sole plate
A metering device is used to? - ✔✔✔-Reduce pressure on the coolant
A minimum service of _____ amps is required for a single residential dwelling unit. - ✔✔✔-100
A non-bearing partition stud can be _____ notched. - ✔✔✔-40%
A radiant-heat systems uses _________ to radiate heat. - ✔✔✔-pipes and panels and/or entire
walls, floors and/or the ceiling
A retaining wall ___________. - ✔✔✔-is used to prevent soil movement
A roof that has a problem with ponding generally still has water on it at least ____ hours after it
has rained. - ✔✔✔-48
A service mast must be used with a service drop if the _____________. - ✔✔✔-weatherhead
does not clear the roof by 3 feet
A split-bus electrical panel uses a double-pole breaker to ______________ the 120-volt circuits.
- ✔✔✔-isolate
A stairway that is _____ inches or more wide must have two handrails. - ✔✔✔-48
A weep screed should be placed ____ inches above grade. - ✔✔✔-4