1. Which document must be approved by the NYC Department of
Buildings before any demolition work begins?
A. Site safety plan
B. Demolition work permit
C. Environmental impact statement
D. Temporary occupancy certificate
Answer: B
A demolition permit issued by DOB is mandatory before starting any
demolition activity in NYC.
, 2. What is the primary responsibility of an Advanced Demolition
Supervisor on site?
A. Operating demolition equipment
B. Managing payroll
C. Ensuring demolition is performed safely and in compliance with
codes
D. Performing structural design
Answer: C
The supervisor is legally responsible for safety, code compliance, and
oversight of demolition operations.
3. Which NYC code governs demolition safety requirements?
A. NYC Zoning Resolution
B. NYC Building Code
C. NYC Fire Code only
D. OSHA standards only
Answer: B
Demolition safety requirements are primarily enforced through the NYC
Building Code, with OSHA also applicable.
4. Before demolition of a structure, what must be verified regarding
utilities?
, A. Utilities are relocated
B. Utilities are operational
C. Utilities are disconnected and capped
D. Utilities are marked only
Answer: C
All utilities must be properly disconnected and capped to prevent fires,
explosions, or flooding.
5. Who is responsible for notifying utility companies prior to demolition?
A. Property owner only
B. Utility companies
C. Demolition supervisor or permit holder
D. DOB inspector
Answer: C
The permit holder or supervisor must ensure utilities are notified and
disconnected.
6. What type of survey is required to document existing conditions of
adjacent buildings?
A. Environmental survey
B. Topographic survey
, C. Pre-demolition structural survey
D. Zoning survey
Answer: C
A pre-demolition survey protects against liability for damage to
neighboring structures.
7. Which material requires special handling and abatement before
demolition?
A. Concrete
B. Steel
C. Asbestos-containing material
D. Brick
Answer: C
Asbestos must be abated by licensed professionals before demolition
begins.
8. What is the purpose of a demolition sequence plan?
A. Reduce project cost
B. Speed up demolition
C. Ensure structural stability and safety during demolition
D. Comply with zoning