DETAILED CORRECT PASSED SOLUTIONS
1. Internal levels per NJAC: 5:17 Level 1: One layer of poly every 5 feet
Level 2: Two layers of poly with a flap on
all doorways, warning signs at the entry
but not building entry, residents can stay
but not in work area. Remove all furniture
and seal large items in plastic sheeting.
Level 3: Same as first two but residents
can't be in dwelling during the day. They
can return at the end of the day when the
site is cleaned up. 5 day time limit
Level 4: Same as first two but the
residents cannot return until clearance is
given at the end of project. no time limit
2. What is NJAC 5:17 for? NJ Admin Code for Lead Hazard Evaluation
3. What is NJAC8:51 or chapter 51 for? Childhood lead poisoning (EBLs)
4. What is NJAC 8:62 for? The standard for certification/training
5. What regulation covers respiratory 29CFR1910.134
pro- tection?
6. What is 1910.1200 cover Hazardous Comms: Specifically, it
requires a chemical component
disclosure book full of Safety Data Sheets
of all products used on site.
7. What is the name of the three HUD
major players in the Industry OSHA
1/
57
,NJ LEAD SUPERVISOR TEST PREP QUESTIONS &
DETAILED CORRECT PASSED SOLUTIONS
EPA
2/
57
,NJ LEAD SUPERVISOR TEST PREP QUESTIONS &
DETAILED CORRECT PASSED SOLUTIONS
8. HUD was created for Attordable housing
9. What are some of the rules that The Lead Based Paint Poisoning Prevention
came from HUD? Act (LBPPA)
The guidelines for the disclosure rule
10. What is UCC? Uniform Construction Code
11. What is a GFCI? Shock Suppressor
12. What is PFAS? Personal Fall Arrest System
13. Following the completion of lead provide the owner with a written disclosure
haz- ardous work, the of the work performed with the scope of
contractor must work.
14. When removing lead-based paint Lightly misting prior and plastic sheeting
chips, what are best practices?
15. Enclosure methods material Drywall
Fiberboar
d
OR Functional equivalent
16. When using screws in the drywall enclo- bite an inch into the stud or
structure.
sure, they must
17. Exterior Levels Level 1: One layer of poly every 6 feet (6
mil thick poly) Barrier system (10ft by 3ft
3/
57
,NJ LEAD SUPERVISOR TEST PREP QUESTIONS &
DETAILED CORRECT PASSED SOLUTIONS
if more than one story)
Level 2: Two layers of poly with a flap on
all doorways, warning signs, residents
can stay but not in work area. Remove all
furniture and seal
4/