QUESTIONS WITH ANSWERS GRADED A+
• Class 1 Product.
Answer: General Electronics Product - includes products where the major
requirement is function of the completed assembly.
• Class 1 Product.
Answer: General Electronics Product - includes products where the major
requirement is function of the completed assembly.
• Class 2 Product.
Answer: Dedicated Service Electronic Product - Continued performance and
extended life required. Uninterrupted service is desired but not required.
• Class 3 Product.
Answer: High Performance Electrical Product - Continued high performance
or performance-on-demand is critical. Equipment downtime cannot be
tolerated. Equipment might be used for life-support or other critical systems.
• Class 2 Product.
Answer: Dedicated Service Electronic Product - Continued performance and
extended life required. Uninterrupted service is desired but not required.
• Class 3 Product.
Answer: High Performance Electrical Product - Continued high performance
or performance-on-demand is critical. Equipment downtime cannot be
tolerated. Equipment might be used for life-support or other critical systems.
• Who as the ultimate responsibility for identifying the class to which the
assembly is evaluated?.
Answer: The Customer.
• Who as the ultimate responsibility for identifying the class to which the
assembly is evaluated?.
Answer: The Customer.
, • Shall.
Answer: Invokes a requirement for manufacturers of all classes or product,
and failure to comply with the requirement is a noncompliance to this
standard.
• Shall.
Answer: Invokes a requirement for manufacturers of all classes or product,
and failure to comply with the requirement is a noncompliance to this
standard.
• Order of Precedence in event of conflict 1.
Answer: 1. Procurement as agreed and documented between customer and
supplier.
• Order of Precedence in event of conflict 1.
Answer: 1. Procurement as agreed and documented between customer and
supplier.
• Order of Precedence in event of conflict 2.
Answer: Master drawing or master ass. drawing reflecting the customer's
detailed requirements.
• Order of Precedence in event of conflict 3.
Answer: IPC-1-610 when invoked by the customer or contract.
• Order of Precedence in event of conflict 2.
Answer: Master drawing or master ass. drawing reflecting the customer's
detailed requirements.
• If documents other than IPC-A-610 are cited, the order of precedence shall
be defined in the _.
Answer: Procurement documents
• Target Condition.
Answer: A condition that is close to perfect, but is not always achievable
and may not be necessary to ensure the reliability of the assembly.
• Acceptable Condition.