SAfe SPC 6.0 FinalVerified Exam Version 1 Newest
2026/2027 Actual Questions And Correct Detailed
Answers (verified Answers)||Already Graded
A+||Newest Exam!!!
What is one way to quickly address impediments to flow?
A. Review burn-down charts
B. Raise visibility of effects outside of ART control
C. Identify them on the Planning Board
D. Wait for the next Inspect and Adapt event - ANSWER-
B. Raise visibility of effects outside of ART control
The Scrum Master/Team Coach wants to establish a
team's initial capacity. The team has two testers, three
developers, one full-time Scrum Master/Team Coach, and
a Product Owner split between two teams. What is their
capacity before calculating for time off?
A. 32
B. 52
C. 40
D. 48 - ANSWER-C. 40
,2|Page
Why is it important for teams to understand the optimum
batch size for their work?
A. to determine the correct cadence
B. To make value flow
C. To understand transaction costs
D. To complete more work - ANSWER-B. To make value
flow
What is the purpose of building a continuous delivery
pipeline?
A. To prioritize development speed over system stability
B. To identify key stakeholders within the system
architecture
C. To prioritize system stability over development speed
D. To deliver new functionality more frequently than with
traditional processes - ANSWER-D. To deliver new
functionality more frequently than with traditional
processes
What is one action that occurs during iteration reviews for
SAFe Scrum teams?
,3|Page
A. Evaluating current state metrics
B. Completing unfinished work
C. Sizing unfinished stories
D. Prioritizing unplanned work - ANSWER-A. Evaluating
current state metrics
Which statement is true about batch size?
A. Large batch sizes ensure time for built-in quality
B. The handoff batch should be made as large as possible
C. When Stories are broken into tasks, it means there are
small batch sizes
D. Large batch sizes increase variability - ANSWER-D.
Large batch sizes increase variability
What is an example of an ART event?
A. Innovation and Planning
B. Team Sync
C. Coach Sync
D. Iteration Review - ANSWER-C. Coach Sync
, 4|Page
What is one benefit of Design Thinking?
A. The Solution is accountable
B. The Solution is actionable
C. The Solution is sustainable
D. The Solution is reliable - ANSWER-C. The Solution is
sustainable
Team A is a maintenance team that cannot always
predictably plan their work. They like to meet daily to
review the needs of the system and plan for how they can
quickly address those needs during the workday. Which of
the following SAFe Lean-Agile methods should Team A
use to plan and execute their work?
A. SAFe Enabling Team
B. SAFe Platform Team
C. SAFe Team Kanban
D. SAFe XP Team - ANSWER-C. SAFe Team Kanban
The primary goal of SAFe is to achieve what?