Assignment 2 Semester 1 2026
Unique number:
Due Date: 11 April 2026
Detailed solutions, explanations, workings
and references.
+27 81 278 3372
, QUESTION 1
1.1 Calculation of WACC
Where:
= 70%
= 30%
= 15%
= 12%
( )
1.2 Projects to Undertake
Decision rule: Accept projects where IRR > WACC (13.09%)
Project IRR Decision
A 16.5% Accept
B 15.2% Accept
C 12.4% Reject
D 10.1% Reject
Check available retained earnings
Optimal equity portion = 70%
Total funds possible using retained earnings:
= 120 000 ÷ 0.7
= R171 429
Varsity Cube 2026 +27 81 278 3372