1. Which tool helps workers understand the movement of materials, information, or people
through a process?
A. Histogram
B. Flowchart
C. Pareto chart
D. Scatter diagram
Correct Answer: B. Flowchart
2. Airlines using self-tagging baggage kiosks are applying all of the following EXCEPT:
A. Self-service
B. Customer participation
C. Automation
D. Postponement
Correct Answer: D. Postponement
3. Which technology provides more consistent inspection accuracy than humans?
A. RFID
B. CAD
C. Vision systems
D. CNC
Correct Answer: C. Vision systems
4. What is an electronically guided cart used to transport materials?
A. Conveyor
,B. Drone
C. AGV
D. Forklift
Correct Answer: C. AGV (Automated Guided Vehicle)
5. If design capacity is 2,000 units and actual output is 1,450 units, what is utilization?
A. 70%
B. 72.5%
C. 75%
D. 80%
Correct Answer: B. 72.5%
6. If effective capacity is 1,500 units and actual output is 1,450 units, what is efficiency?
A. 90%
B. 93.3%
C. 96.7%
D. 98%
Correct Answer: C. 96.7%
7. What is the maximum theoretical output under ideal conditions?
A. Effective capacity
B. Actual output
C. Design capacity
D. Peak capacity
Correct Answer: C. Design capacity
8. What is a valid option when demand exceeds capacity?
A. Reduce production
B. Increase idle time
C. Schedule long lead times
D. Shut down operations
Correct Answer: C. Schedule long lead times
, 9. Which station is the bottleneck?
Station 1: 30 units/hr
Station 2: 5 units/hr
Station 3: 10 units/hr
A. Station 1
B. Station 2
C. Station 3
D. None
Correct Answer: B. Station 2
10. What is the bottleneck time per unit?
A. 5 minutes
B. 10 minutes
C. 12 minutes
D. 15 minutes
Correct Answer: C. 12 minutes
11. What is bottleneck time?
A. Fastest station time
B. Average production time
C. Time of the slowest workstation
D. Total system time
Correct Answer: C. Slowest workstation
12. Which statement is NOT a valid bottleneck principle?
A. Increasing non-bottleneck capacity is a mirage
B. Non-bottleneck capacity increases system output
C. Release work based on bottleneck pace
D. Lost bottleneck time reduces system capacity
Correct Answer: B. Non-bottleneck increases system output
13. Production refers to:
A. Selling goods