CM 2112 Earthwork Study Guide updated for the 2026/2027 syllabus 1. Earthwork Fundamentals (Questions 1–15) 1. What is the primary purpose of earthwork in construction? o ANSWER To modify the ground surface to achieve desired elevations, slopes, and stability for structures. 2. Define "cut" in earthwork terms. o ANSWER Excavation of material from above a specified reference plane. 3. Define "fill" in earthwork terms. o ANSWER Placement of earth material to raise the ground elevation. 4. What is "borrow material"? o ANSWER Earth material obtained from outside the project site to supplement fill requirements. 5. What does "waste material" refer to? o ANSWER Excess excavated material not needed for fill and removed from the site. 6. What is the difference between "stripping" and "excavation"? o ANSWER Stripping removes topsoil/vegetation; excavation removes earth below topsoil for grading. 7. Why is topsoil typically stockpiled separately? o ANSWER For reuse in final landscaping and to preserve organic content. 8. What is a "balanced earthwork" project? o ANSWER Cut volume equals fill volume, minimizing borrow and waste. 9. Name three factors that affect soil swell and shrinkage. o ANSWER Moisture content, soil type, compaction effort - ANSWER 10. What is "swell" in earthmoving? o ANSWER Increase in volume when soil is excavated from its natural state. 11. What is "shrinkage factor"? o ANSWER Ratio of compacted volume to bank volume (bank cubic yards to compacted cubic yards). 12. Define "bank cubic yard (BCY)". o ANSWER One cubic yard of material in its natural, undisturbed state. 13. Define "loose cubic yard (LCY)". o ANSWER One cubic yard of material after excavation and before compaction. 14. Define "compacted cubic yard (CCY)". o ANSWER One cubic yard of material after placement and compaction. 15. What is the typical swell range for common earth (loam)? o ANSWER 20–25% - ANSWER 2. Soil Classification & Properties (16–30) 16. What does the Unified Soil Classification System (USCS) group soils into? o ANSWER Coarse-grained, fine-grained, and highly organic soils - ANSWER 17. What is the plasticity index (PI)? o ANSWER Numerical difference between liquid limit and plastic limit. 18. Which soil type has the highest shrink-swell potential? o ANSWER High-plasticity clay (CH) - ANSWER 19. What is optimum moisture content (OMC)? o ANSWER Moisture level at which maximum dry density is achieved for a given compaction energy. 20. What happens if compaction occurs above OMC? o ANSWER Soil may become too wet, leading to lower dry density and instability. 21. What is "proctor test"? o ANSWER Laboratory test to determine maximum dry density and OMC. 22. Name the two common Proctor tests. o ANSWER Standard Proctor and Modified Proctor - ANSWER 23. What is the typical compaction requirement for structural fill under buildings? o ANSWER 95% of maximum dry density (Standard Proctor) - ANSWER 24. What is cohesion in soils? o ANSWER Shear strength due to particle bonding (clays).

Meer zien Lees minder
Instelling
CM 2112 Earthwork
Vak
CM 2112 Earthwork

Voorbeeld van de inhoud

CM 2112 Earthwork Study
Guide updated for the 2026/2027
syllabus

1. Earthwork Fundamentals (Questions 1–15)
1. What is the primary purpose of earthwork in construction?
o ANSWER ✓ To modify the ground surface to achieve desired elevations, slopes, and
stability for structures.
2. Define "cut" in earthwork terms.
o ANSWER ✓ Excavation of material from above a specified reference plane.
3. Define "fill" in earthwork terms.
o ANSWER ✓ Placement of earth material to raise the ground elevation.
4. What is "borrow material"?
o ANSWER ✓ Earth material obtained from outside the project site to supplement fill
requirements.
5. What does "waste material" refer to?
o ANSWER ✓ Excess excavated material not needed for fill and removed from the site.
6. What is the difference between "stripping" and "excavation"?
o ANSWER ✓ Stripping removes topsoil/vegetation; excavation removes earth below
topsoil for grading.
7. Why is topsoil typically stockpiled separately?
o ANSWER ✓ For reuse in final landscaping and to preserve organic content.
8. What is a "balanced earthwork" project?
o ANSWER ✓ Cut volume equals fill volume, minimizing borrow and waste.
9. Name three factors that affect soil swell and shrinkage.
o ANSWER ✓ Moisture content, soil type, compaction effort - ANSWER ✓
10. What is "swell" in earthmoving?
o ANSWER ✓ Increase in volume when soil is excavated from its natural state.
11. What is "shrinkage factor"?

, o ANSWER ✓ Ratio of compacted volume to bank volume (bank cubic yards to
compacted cubic yards).
12. Define "bank cubic yard (BCY)".
o ANSWER ✓ One cubic yard of material in its natural, undisturbed state.
13. Define "loose cubic yard (LCY)".
o ANSWER ✓ One cubic yard of material after excavation and before compaction.
14. Define "compacted cubic yard (CCY)".
o ANSWER ✓ One cubic yard of material after placement and compaction.
15. What is the typical swell range for common earth (loam)?
o ANSWER ✓ 20–25% - ANSWER ✓




2. Soil Classification & Properties (16–30)
16. What does the Unified Soil Classification System (USCS) group soils into?
o ANSWER ✓ Coarse-grained, fine-grained, and highly organic soils - ANSWER ✓
17. What is the plasticity index (PI)?
o ANSWER ✓ Numerical difference between liquid limit and plastic limit.
18. Which soil type has the highest shrink-swell potential?
o ANSWER ✓ High-plasticity clay (CH) - ANSWER ✓
19. What is optimum moisture content (OMC)?
o ANSWER ✓ Moisture level at which maximum dry density is achieved for a given
compaction energy.
20. What happens if compaction occurs above OMC?
o ANSWER ✓ Soil may become too wet, leading to lower dry density and instability.
21. What is "proctor test"?
o ANSWER ✓ Laboratory test to determine maximum dry density and OMC.
22. Name the two common Proctor tests.
o ANSWER ✓ Standard Proctor and Modified Proctor - ANSWER ✓
23. What is the typical compaction requirement for structural fill under buildings?
o ANSWER ✓ 95% of maximum dry density (Standard Proctor) - ANSWER ✓
24. What is cohesion in soils?
o ANSWER ✓ Shear strength due to particle bonding (clays).

Geschreven voor

Instelling
CM 2112 Earthwork
Vak
CM 2112 Earthwork

Documentinformatie

Geüpload op
4 april 2026
Aantal pagina's
9
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.09
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
SmartscoreAaron Chicago State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
77
Lid sinds
1 jaar
Aantal volgers
6
Documenten
4009
Laatst verkocht
2 dagen geleden
SMARTSCORES LIBRARY

Get top-tier academic support for Psychology, Nursing, Business, Engineering, HRM, Math, and more. Our team of professional tutors delivers high-quality homework, quiz, and exam assistance—ensuring scholarly excellence and grade-boosting results. Trust our collaborative expertise to help you succeed in any course at U.S.A Institutions.

3.1

7 beoordelingen

5
3
4
1
3
0
2
0
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen