When installing TDW 21 what size b***h did you use to drill
the hole for the
sensor - ANSWER -
3/4"
When programming a PIR to which Loop number Must you use -
ANSWER -1
Which step should you always take to ensure that the Z wave
network is aligned
in the strongest manner - ANSWER -Select rediscover network
from the Z wave
toolbox
When powering up a deadbolt smart lock for the first time which
of the following
things must you always do - ANSWER -Initiates the lock
handing procedure
, What is the input voltage range of the doorbell camera -
ANSWER -12-24 V
How many stages of heat does a conventional unit with a
furnace have if it has
both a W and W2 wire - ANSWER -Two
stages
Determine the HVAC set up based on the following wiring, C, B,
W-2, Y, Rh, G -
ANSWER -Heat pump, AC powered, one stage pump,
1 Aux heat
Select all that apply which of the following materials can
you use to group
multiple ground terminals in the takeover module -
ANSWER -B
connectors/beans and
Wire caps
Which of the following sensors are not allowed to program
using a translator -
ANSWER -Smoke
detector
True or false when installing the take 345 you must always
test the new 12 V