Adhesive Anchor Training Questions and
Correct Answers/ Latest Update / Already
Graded
minimum anchor spacing and edge distance, as well as minimum
member thickness, must comply with the values given
Ans: In the products ICC-ES Report
The registered design professional in responsible charge and the
engineers of record involved in the design of the project are permitted
to act as the
Ans: Approved Agency
If reinforcing bars are encountered during drilling the correct action
would be
Ans: Consulting with the EOR
for adhesive anchors, the characteristics bond stresses and suitability
for structural applications are established by testing in accordance with
Ans: ACI 355.4
All rights reserved © 2025/ 2026 |
, Page |2
Special inspections and tests shall be required for proposal work that
is, in the opinion of the building official, unusual in its nature, as such,
but not limited to
Ans: All of the above
ACI 355.4, qualification of post installed adhesive anchors in concrete,
is applicable to anchors with a specified minimum embedment depth
of
Ans: 1 - 5/8 inches
Proof loads are usually determined as a
Ans: Percentage of the anchor ultimate tensile strength
True or False: The contractor is permitted to employ the approved
agencies for special inspection where the contractor is also the owner
of the project?
Ans: True
The effective embedment depth, measure from the concrete surface
to the deepest point at which bond to the concrete is established is
identified as
Ans: h subscript(ef)
All rights reserved © 2025/ 2026 |
, Page |3
True or false: Powers PE1000+ epoxy adhesive are recognized for use
to resist short-term and long-term loads, including wind and
earthquake loads, subject to conditions of the ICC-ES Evaluation
report?
Ans: True
Short sections of anchor rods the have been burned or sawed are
indictive of:
Ans: Incorrect embedment
The elapsed time after mixing adhesive material components to onset
of significant chemical reaction as characterized by an increase in
viscosity is
Ans: Gel Time
Periodic and final inspection reports are required to be summited to
the
Ans: Building official and engineer or architect of record
Powers PE1000+ epoxy adhesive anchors must be installed in
accordance with?
All rights reserved © 2025/ 2026 |