Who can best interpret Architectural drawings? - CORRECT ANSWER-Architect Who should sign architectural drawings? - CORRECT ANSWER-Architect You were commissioned to do a Master Plan. What should you do first? - CORRECT ANSWER-Survey the location Responsibilities of an Architect: When He/She conducts the checking of materials and works done it it in adherence with the specifications - CORRECT ANSWER-Full time supervision How often does the Architect-of-record visit the job site? - CORRECT ANSWER-As often as he/she wants Specifications should be clear and easy to understand. What must be avoided? - CORRECT ANSWER-Sentence with double meaning The record tests of materials and of concrete must be preserved after the completion of the project for a t least? - CORRECT ANSWER-5 years After a change of use (renovation)of the building, what should be secured? - CORRECT ANSWER-Certificate of occupancy A permit prior to the commencement of a project - CORRECT ANSWER-Building permit What are the qualifications of someone who wishes to take the licensure exam for architects? - CORRECT ANSWER-Filipino citizen, Graduate of Architecture, Submitted the necessary requirements to PRC, (ALL OF THE ABOVE) After how many days can a contractor stop work if the architect's approval for the change of work is delayed? - CORRECT ANSWER-15 days An outline specification enumerating the type trade names of materials to be used and finishes is known as - CORRECT ANSWER-Schedule of materials and finishes Under PD 957 and BP 220, how many units shall be the maximum number of row houses per block/cluster? - CORRECT ANSWER-20Under BP 220, the maximum length of a block is 400 meters. However, Block lengths exceeding 250 meters should be provided with an alley approximately ay midlength. How wide is the alley? - CORRECT ANSWER-2.00 meters Under BP 220. it shall have a width of 3.00 meters intended only to provide pedestrian access to property for socialized housing projects. It shall have a maximum length of 60 meters - CORRECT ANSWER-Pathwalk Under PD 957, what is the minimum lot frontage for row houses? - CORRECT ANSWER-4 Under BP220, what is the minimum lot frontage for socialized row houses? - CORRECT ANSWER-3.5 Meters Which of the following is not part of the RROW? - CORRECT ANSWER-Yard What is the minimum RROW access to an Interior lot? - CORRECT ANSWER-Verify Answer Space left in a lot between the building and the property line - CORRECT ANSWERYard For a RROW of 9.00 meters or more, the minimum width of the sidewalk on each side shall be? - CORRECT ANSWER-1.2m As per PD 1096, what is the minimum horizontal dimension of a court? - CORRECT ANSWER-2.00 m Minimum front setback for R-1 - CORRECT ANSWER-4.50 m Minimum side setback for R-1 - CORRECT ANSWER-2m Minimum rear setback for R-1 - CORRECT ANSWER-2.00 m Using the 1977 National Building Code, what is the minimum setback for R-1 - CORRECT ANSWER-3.0m What is the minimum front setback for R-4? - CORRECT ANSWER-4.5 Meters What is the minimum ceiling height for Habitable Rooms with Artificial Ventilation of a single-storey structure? - CORRECT ANSWER-2.4 Meters What is the minimum ceiling height for Habitable Rooms with Artificial Ventilation at the Second floor? - CORRECT ANSWER-2.40mWhat is the minimum ceiling height at the ground floor for Habitable Rooms with Natural Ventilation? - CORRECT ANSWER-2.70m Height of ceiling at 5th floor with Natural Ventilation? - CORRECT ANSWER-2.7 Meters What is the minimum dimension of a Kitchen? - CORRECT ANSWER-1.5 M x 2 M Width of Drop Curb? - CORRECT ANSWER-0.90m Maximum height of Spire, if made of combustible material, above the BHL? - CORRECT ANSWER-6 meters Maximum height of Spire, if made of incombustible material, above the BHL? - CORRECT ANSWER-Limited only by Structural Design Who prepares the Comprehensive Land Use of Plan? - CORRECT ANSWER-HLURB Who adopts the land use plan when it was already approved? - CORRECT ANSWERSangguniang Panglunsod Which will you least or NOT consider in making a Comprehensive Development Plan? - CORRECT ANSWER-Political/Institutional Which is NOT considered in a Master Development Plan? - CORRECT ANSWERBuilding Height What is meant by R3 in residential zone? - CORRECT ANSWER-High Density Housing Specifications contain? - CORRECT ANSWER-Quality of Materials What is the purpose of Bill of Materials? - CORRECT ANSWER-Reference on Cost Who is responsible for making/ producing Architectural Drawings? - CORRECT ANSWER-Architect What is not a Structural Plan? - CORRECT ANSWER-Schedule of beams Basic function of an open door? - CORRECT ANSWER-Means of access Allowable projection for the signage of a building that is NOT arcaded - CORRECT ANSWER-1.20 Minimum signage height of a building that is NOT arcaded - CORRECT ANSWER-3.0m Minimum signage height of a building that is NOT arcaded - CORRECT ANSWER-3.0mMinimum signage height of a building that is arcaded - CORRECT ANSWER-5 meters The minimum arcade height above the established sidewalk grade is - CORRECT ANSWER-3.0m Allowable projection for the signage of a building that is arcaded - CORRECT ANSWER-1.00 It is a bond that is an approved form of security furnished by the contractor as a guarantee to execute work in accordance with the terms of the contract - CORRECT ANSWER-Performance Bond In the construction industry, it is a person, firm or corporation that provides guarantee or undertakes an obligation to pay in the event of failure on the part of the Contractor to fulfil his part. - CORRECT ANSWER-Surety

Meer zien Lees minder
Instelling
ICA 2 PRELIM
Vak
ICA 2 PRELIM

Voorbeeld van de inhoud

ICA 2 PRELIM REVIEWER
Who can best interpret Architectural drawings? - CORRECT ANSWER-Architect

Who should sign architectural drawings? - CORRECT ANSWER-Architect

You were commissioned to do a Master Plan. What should you do first? - CORRECT
ANSWER-Survey the location

Responsibilities of an Architect: When He/She conducts the checking of materials and
works done it it in adherence with the specifications - CORRECT ANSWER-Full time
supervision

How often does the Architect-of-record visit the job site? - CORRECT ANSWER-As
often as he/she wants

Specifications should be clear and easy to understand. What must be avoided? -
CORRECT ANSWER-Sentence with double meaning

The record tests of materials and of concrete must be preserved after the completion of
the project for a t least? - CORRECT ANSWER-5 years

After a change of use (renovation)of the building, what should be secured? - CORRECT
ANSWER-Certificate of occupancy

A permit prior to the commencement of a project - CORRECT ANSWER-Building permit

What are the qualifications of someone who wishes to take the licensure exam for
architects? - CORRECT ANSWER-Filipino citizen, Graduate of Architecture, Submitted
the necessary requirements to PRC, (ALL OF THE ABOVE)

After how many days can a contractor stop work if the architect's approval for the
change of work is delayed? - CORRECT ANSWER-15 days

An outline specification enumerating the type trade names of materials to be used and
finishes is known as - CORRECT ANSWER-Schedule of materials and finishes

Under PD 957 and BP 220, how many units shall be the maximum number of row
houses per block/cluster? - CORRECT ANSWER-20

, Under BP 220, the maximum length of a block is 400 meters. However, Block lengths
exceeding 250 meters should be provided with an alley approximately ay midlength.
How wide is the alley? - CORRECT ANSWER-2.00 meters

Under BP 220. it shall have a width of 3.00 meters intended only to provide pedestrian
access to property for socialized housing projects. It shall have a maximum length of 60
meters - CORRECT ANSWER-Pathwalk

Under PD 957, what is the minimum lot frontage for row houses? - CORRECT
ANSWER-4

Under BP220, what is the minimum lot frontage for socialized row houses? - CORRECT
ANSWER-3.5 Meters

Which of the following is not part of the RROW? - CORRECT ANSWER-Yard

What is the minimum RROW access to an Interior lot? - CORRECT ANSWER-Verify
Answer

Space left in a lot between the building and the property line - CORRECT ANSWER-
Yard

For a RROW of 9.00 meters or more, the minimum width of the sidewalk on each side
shall be? - CORRECT ANSWER-1.2m

As per PD 1096, what is the minimum horizontal dimension of a court? - CORRECT
ANSWER-2.00 m

Minimum front setback for R-1 - CORRECT ANSWER-4.50 m

Minimum side setback for R-1 - CORRECT ANSWER-2m

Minimum rear setback for R-1 - CORRECT ANSWER-2.00 m

Using the 1977 National Building Code, what is the minimum setback for R-1 -
CORRECT ANSWER-3.0m

What is the minimum front setback for R-4? - CORRECT ANSWER-4.5 Meters

What is the minimum ceiling height for Habitable Rooms with Artificial Ventilation of a
single-storey structure? - CORRECT ANSWER-2.4 Meters

What is the minimum ceiling height for Habitable Rooms with Artificial Ventilation at the
Second floor? - CORRECT ANSWER-2.40m

Geschreven voor

Instelling
ICA 2 PRELIM
Vak
ICA 2 PRELIM

Documentinformatie

Geüpload op
6 april 2026
Aantal pagina's
15
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brainarium Delaware State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1928
Lid sinds
3 jaar
Aantal volgers
1044
Documenten
22984
Laatst verkocht
3 dagen geleden

3.8

327 beoordelingen

5
152
4
62
3
55
2
16
1
42

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen