answers 2026\2027 A+ Grade
True/False
According to the NERC Functional Model, there is no difference between the function and the entity.
A) True
B) False
- correct answer B) False
True/False
Analysis type questions are designed to be the least complex from a human cognitive process.
A) True
B) False
- correct answer B) False
True/False
A Transmission Service Provider is an entity that both owns and operates transmission facilities on the
Bulk Electric System.
A) True
,B) False
- correct answer B) False
True/False
The NERC Functional Model is designed so that the functions of Generator Owner and Generator
Operator can be performed by two different entities.
A) True
B) False
- correct answer A) True
How many forms of identification are required when taking the NERC System Operator Certification
exam?
A) 4
B) 9
C) 1
D) 2
- correct answer 2
The NERC came into existence as a result of the Electric Power Reliability Act of what year?
A) 1958
B) 2005
C) 1967
D) 1997
- correct answer 1967
How many certification credentials does NERC have examinations for?
, A) 2
B) 4
C) 6
D) 3
- correct answer 4
Match the acronym with the appropriate organization.
FERC North American Electric Reliability Corp
NERC Florida Reliability Coordinating Council
FRCC Reliability First
RF Federal Energy Regulatory Commission
- correct answer 1. FERC Federal Energy Regulatory Commission
2. NERC North American Electric Reliability Corporation
3. FRCC Florida Reliability Coordinating Council
4. RF Reliability First
True/False
Balancing Authorities are responsible to ensure that transmission facilities are operated within the limits
that are established by the Transmission Owners.
- correct answer False
The first power pool in the industry was created in 1927 and was known as which of the following?
- correct answer Pennsylvania-New Jersey Interconnection
How many Interconnections are there in North America?