Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CTS Exam Prep UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS

Rating
-
Sold
-
Pages
29
Grade
A+
Uploaded on
07-04-2026
Written in
2025/2026

CTS Exam Prep UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS What are the four teams that comprise the overall Project Team? - CORRECT ANSWER Owner, Design, Installation, and Management Who would belong to the Design team? - CORRECT ANSWER Consultant in their title except the moving consultant Anyone with Which groups make up the Management Team? - CORRECT ANSWER Construction Manager, and Building Management Agency Developer, The End-User, Facility Manager and Building Committee comprise which team within the Project Team? - CORRECT ANSWER Owner Which group represent the generic roles that are important to the Project process? - CORRECT ANSWER Project Managers, Designers and Installers Which project characteristics must be considered in order to determine which method is best suited for a particular project? - CORRECT ANSWER Schedule, Size, Type, Complexity, and Procurement Requirements What is an important aspect of funding that has a direct impact on the project process and design/installation? - CORRECT ANSWER Technical Support Funding

Show more Read less
Institution
CTS
Course
CTS

Content preview

CTS Exam Prep UPDATED ACTUAL
QUESTIONS AND CORRECT ANSWERS
What are the four teams that comprise the overall Project Team? - CORRECT
ANSWER Owner, Design, Installation, and Management



Who would belong to the Design team? - CORRECT ANSWER Anyone with
Consultant in their title except the moving consultant



Which groups make up the Management Team? - CORRECT ANSWER Developer,
Construction Manager, and Building Management Agency


The End-User, Facility Manager and Building Committee comprise which team within the
Project Team? - CORRECT ANSWER Owner



Which group represent the generic roles that are important to the Project process? -
CORRECT ANSWER Project Managers, Designers and Installers



Which project characteristics must be considered in order to determine which method is best
suited for a particular project? - CORRECT ANSWER Schedule, Size, Type,
Complexity, and Procurement Requirements



What is an important aspect of funding that has a direct impact on the project process and
design/installation? - CORRECT ANSWER Technical Support Funding



Whether a construction project is large or small, which milestones must be achieved in a
typical schedule? - CORRECT ANSWER Programming, Building Design, AV Bid, and
Move-In



What type of project is a typical Consultant-Led Design-Bid-Build contract structure good
for? - CORRECT ANSWER Long term projects with extended project cycles

,What is the risk in using an OFE/Integrator Installed contract structure? - CORRECT
ANSWER System and infrastructure design and facility functionality may suffer



What are some of the important project scope and size considerations in selecting an AV
provider? - CORRECT ANSWER Financial Stability, Current Workload, and Company
Credentials



What type of document typically includes Project Size Requirements, Corporate Profile,
Team Personnel, and Warranty Response Time? - CORRECT ANSWER RFQ



a significant difference between the Two-Envelope Bid
Method and the Qualifications- Based Selection Method? - CORRECT
ANSWER Negotiate with the highest ranking firm to finalize the contract



What is one of the disadvantages of contracting the AV integrator to the electrical

subcontractor? - CORRECT ANSWER More layers of responsibility and
communication



When conducting a complete project bid process, what milestone follows the issuing of the
RFP? - CORRECT ANSWER Pre-Bid Meeting



Under what circumstances would you likely use an A305-1986 form? - CORRECT
ANSWER Scoring responses to an RFQ



What is the ideal way to contract an AV integrator? - CORRECT ANSWER Directly to
the Owner


The process of identifying the activities that end-users need to perform, and developing the
functional descriptions of your systems is referred to as:? - CORRECT
ANSWER Needs Analysis

, What is the main task of the third Step of the Program Phase of a Project? - CORRECT
ANSWER Conducting program meetings



What should be included in the written Program Report? - CORRECT ANSWER ...A
conceptual and functional system description



The more accurate means to estimate dimensions of a commercial space during a site
inspection would be to? - CORRECT ANSWER Count Ceiling Tiles in a drop tile
instalation



A client requires a new boardroom. The sales person and engineer are sent to the premises to
measure the facility and talk to the client. At this stage they should be performing a _ -
CORRECT ANSWER Needs Analysis



Sightlines for audience viewing in a given presentation space can be improved by: -
CORRECT ANSWER Providing a sloped, or stepped, seating arrangement



After presenting a proposal, what is the correct plan of action for following up with the
client? - CORRECT ANSWER Regularly, until a decision is made



AV professionals determine the end user's needs by examining three things: the required
applications, the tasks, and the: - CORRECT ANSWER Functions to support the
applications



When working with a client to design an AV solution for a new conference center, the client
requests a detailed budget for the equipment and installation. What phase is the project in? -
CORRECT ANSWER Design phase



The HDTV aspect ratio is equal to which of the following? - CORRECT
ANSWER 1.78:1



Please select the appropriate resolution for SXGA. - CORRECT ANSWER 1280 x
1024

Written for

Institution
CTS
Course
CTS

Document information

Uploaded on
April 7, 2026
Number of pages
29
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDTOPGRADES Stanford University
Follow You need to be logged in order to follow users or courses
Sold
56
Member since
1 year
Number of followers
2
Documents
7140
Last sold
1 week ago
TOPSELLER

Hi there! I'm dedicated to sharing my high-quality study guides and helpful EXAM Materials to make your learning easier and more efficient. All my materials are well-organized and tailored to help you ace your courses. I offer genuine and dependable exam papers that are directly obtained from well-known, reputable institutions as a highly regarded professional who specializes in sourcing study materials. Kindly don't hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded and fully guaranteed

Read more Read less
3.8

8 reviews

5
3
4
1
3
3
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions