Construction Quality Management for
Contractors, CMGT 4300 Test 1
Save
Terms in this set (129)
The _________ consists of daily checks of Follow-up Phase
the work to assure continuing
compliance with contract
requirements
Design-Build contracts require The QC Manager to be in place and take an active
role in the review and coordination of the design.
Which of the following is included in Safety
all three phases of the Three Phases
of Control?
The purpose of Construction Quality Achieve the quality established by properly
Management is to developed requirements through the combined
responsibility, but separate, efforts of contractors
and government personnel
Testing is extremely important in Both the contractor and the government
construction quality management
and is performed by
,The primary purpose of the Three- Require the contractor to plan, schedule, and
Phase Control System is to perform quality management actions to assure
work meets all specified quality standards
Quality Assurance Personnel have Require the contractor to maintain the quality
the responsibility to specified in the plans and specifications
The _________________ is the appropriate Preparatory Phase
time to assure that all materials
and/or equipment have been tested,
submitted, and approved
The Preconstruction Conference and Conducted prior to the commencement of any
Coordination and Mutual physical construction work
Understanding Meeting Are
Contractor testing procedures: Are specified in the technical specs, outlined in the
QCP, and addressed at Coordination and Mutual
Understanding Meeting
The Quality Control Plan contains Identification of individual quality quality control
personnel, including name, qualifications, assigned
duties, responsibilities and authorities.
Tests that are unannounced, Quality assurance tests
randomly performed, and repeat
quality control tests are
The contractor is required to conduct There are no exceptions to the rule
a Preparatory Phase Meeting before
they begin any definable feature of
work except when
, During the punch-out inspection of a Quality Control personnel prepare and punch-list
project: and make corrections
The Quality Control Report should All of the above
include
In a design build contract, if the Contractor submits a design verification request to
contractor has a question about the the contractor's design team
design, what is the process to get an
answer?
Submittals are Necessary to demonstrate that the proposed
materials, etc. are in compliance with the contract.
The success or failure of all The ability to control costs, finance work, estimate
contractors is based upon jobs, schedule the work and maintain effective
quality control
The contract requires the contractor Daily
to submit quality control reports
All submittals for government Contractor to the Government
approval must be provided by the
_________________ in time to allow for the
review, approval, procurement,
delivery, and performance of
preparatory phase for an item before
it is needed for construction.
Partnering relationships are based Building trust and dedication to common goals
upon
Contractors, CMGT 4300 Test 1
Save
Terms in this set (129)
The _________ consists of daily checks of Follow-up Phase
the work to assure continuing
compliance with contract
requirements
Design-Build contracts require The QC Manager to be in place and take an active
role in the review and coordination of the design.
Which of the following is included in Safety
all three phases of the Three Phases
of Control?
The purpose of Construction Quality Achieve the quality established by properly
Management is to developed requirements through the combined
responsibility, but separate, efforts of contractors
and government personnel
Testing is extremely important in Both the contractor and the government
construction quality management
and is performed by
,The primary purpose of the Three- Require the contractor to plan, schedule, and
Phase Control System is to perform quality management actions to assure
work meets all specified quality standards
Quality Assurance Personnel have Require the contractor to maintain the quality
the responsibility to specified in the plans and specifications
The _________________ is the appropriate Preparatory Phase
time to assure that all materials
and/or equipment have been tested,
submitted, and approved
The Preconstruction Conference and Conducted prior to the commencement of any
Coordination and Mutual physical construction work
Understanding Meeting Are
Contractor testing procedures: Are specified in the technical specs, outlined in the
QCP, and addressed at Coordination and Mutual
Understanding Meeting
The Quality Control Plan contains Identification of individual quality quality control
personnel, including name, qualifications, assigned
duties, responsibilities and authorities.
Tests that are unannounced, Quality assurance tests
randomly performed, and repeat
quality control tests are
The contractor is required to conduct There are no exceptions to the rule
a Preparatory Phase Meeting before
they begin any definable feature of
work except when
, During the punch-out inspection of a Quality Control personnel prepare and punch-list
project: and make corrections
The Quality Control Report should All of the above
include
In a design build contract, if the Contractor submits a design verification request to
contractor has a question about the the contractor's design team
design, what is the process to get an
answer?
Submittals are Necessary to demonstrate that the proposed
materials, etc. are in compliance with the contract.
The success or failure of all The ability to control costs, finance work, estimate
contractors is based upon jobs, schedule the work and maintain effective
quality control
The contract requires the contractor Daily
to submit quality control reports
All submittals for government Contractor to the Government
approval must be provided by the
_________________ in time to allow for the
review, approval, procurement,
delivery, and performance of
preparatory phase for an item before
it is needed for construction.
Partnering relationships are based Building trust and dedication to common goals
upon