Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Construction Quality Management for Contractors, CMGT 4300 Test 1

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
08-04-2026
Written in
2025/2026

Construction Quality Management for Contractors, CMGT 4300 Test 1

Institution
Course

Content preview

Construction Quality Management for
Contractors, CMGT 4300 Test 1

Save




Terms in this set (129)



The _________ consists of daily checks of Follow-up Phase
the work to assure continuing
compliance with contract
requirements


Design-Build contracts require The QC Manager to be in place and take an active
role in the review and coordination of the design.


Which of the following is included in Safety
all three phases of the Three Phases
of Control?


The purpose of Construction Quality Achieve the quality established by properly
Management is to developed requirements through the combined
responsibility, but separate, efforts of contractors
and government personnel


Testing is extremely important in Both the contractor and the government
construction quality management
and is performed by

,The primary purpose of the Three- Require the contractor to plan, schedule, and
Phase Control System is to perform quality management actions to assure
work meets all specified quality standards


Quality Assurance Personnel have Require the contractor to maintain the quality
the responsibility to specified in the plans and specifications


The _________________ is the appropriate Preparatory Phase
time to assure that all materials
and/or equipment have been tested,
submitted, and approved


The Preconstruction Conference and Conducted prior to the commencement of any
Coordination and Mutual physical construction work
Understanding Meeting Are


Contractor testing procedures: Are specified in the technical specs, outlined in the
QCP, and addressed at Coordination and Mutual
Understanding Meeting


The Quality Control Plan contains Identification of individual quality quality control
personnel, including name, qualifications, assigned
duties, responsibilities and authorities.


Tests that are unannounced, Quality assurance tests
randomly performed, and repeat
quality control tests are


The contractor is required to conduct There are no exceptions to the rule
a Preparatory Phase Meeting before
they begin any definable feature of
work except when

, During the punch-out inspection of a Quality Control personnel prepare and punch-list
project: and make corrections


The Quality Control Report should All of the above
include


In a design build contract, if the Contractor submits a design verification request to
contractor has a question about the the contractor's design team
design, what is the process to get an
answer?


Submittals are Necessary to demonstrate that the proposed
materials, etc. are in compliance with the contract.


The success or failure of all The ability to control costs, finance work, estimate
contractors is based upon jobs, schedule the work and maintain effective
quality control


The contract requires the contractor Daily
to submit quality control reports


All submittals for government Contractor to the Government
approval must be provided by the
_________________ in time to allow for the
review, approval, procurement,
delivery, and performance of
preparatory phase for an item before
it is needed for construction.


Partnering relationships are based Building trust and dedication to common goals
upon

Written for

Course

Document information

Uploaded on
April 8, 2026
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$17.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
profEve

Get to know the seller

Seller avatar
profEve Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
8
Member since
5 months
Number of followers
0
Documents
1046
Last sold
3 weeks ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions