The purpose of Construction Quality Achieve the quality established by properly
Management is to: developed requirements through the combined
responsibility, but seperate efforts of contractpr
smd government personnel.
Construction Quality Management is According to plans and specifications, on time,
the performance of tasks, which within a defined budget and a safe work
ensure that construction is environment.
performed.
Partnering relationships are based Building trust and dedication to common goals
upon:
It is the responsibility of Quality Periodically verify that the contractors system of
Assurance Personnel to: control is working effectively.
An effective contractor quality Be an incentive for work to be done correctly the
control program will: first time resulting in earlier completion, reduced
field overhead costs, and greater profits.
, The success or failure of all The ability to control costs, finance work, estimate
contractors is based upon: jobs, schedule the work, and maintain effective
quality control.
Quality Assurance Personnel have Require contractors to maintain the quality
the responsibility to: specified in the plans and specifications.
Inspection is: The process by which ongoing and completed
work is examined
During the punch-out inspection of a Quality Assurance Personnel must assure that the
project: contractor prepares a punch-list and makes
corrections.
If there is a disagreement whether the The government makes the final determination
contractors work complies with the
contract:
Characteristics that describe a Cross-referenced listings to the contractors
definable feature of work include: construction schedule that may have more than
one definable feature under a section of the
specifications.
The _____________________ consists of daily Follow-up phase
checks of the work to assure
continuing compliance with contract
requirements.
The Quality Assurance Plan: Is a government management tool establishing
staffing, training, pre-award activities, and
surveillance activities.
ANSWERS || 100% GUARANTEED
Save
Terms in this set (40)
The purpose of Construction Quality Achieve the quality established by properly
Management is to: developed requirements through the combined
responsibility, but seperate efforts of contractpr
smd government personnel.
Construction Quality Management is According to plans and specifications, on time,
the performance of tasks, which within a defined budget and a safe work
ensure that construction is environment.
performed.
Partnering relationships are based Building trust and dedication to common goals
upon:
It is the responsibility of Quality Periodically verify that the contractors system of
Assurance Personnel to: control is working effectively.
An effective contractor quality Be an incentive for work to be done correctly the
control program will: first time resulting in earlier completion, reduced
field overhead costs, and greater profits.
, The success or failure of all The ability to control costs, finance work, estimate
contractors is based upon: jobs, schedule the work, and maintain effective
quality control.
Quality Assurance Personnel have Require contractors to maintain the quality
the responsibility to: specified in the plans and specifications.
Inspection is: The process by which ongoing and completed
work is examined
During the punch-out inspection of a Quality Assurance Personnel must assure that the
project: contractor prepares a punch-list and makes
corrections.
If there is a disagreement whether the The government makes the final determination
contractors work complies with the
contract:
Characteristics that describe a Cross-referenced listings to the contractors
definable feature of work include: construction schedule that may have more than
one definable feature under a section of the
specifications.
The _____________________ consists of daily Follow-up phase
checks of the work to assure
continuing compliance with contract
requirements.
The Quality Assurance Plan: Is a government management tool establishing
staffing, training, pre-award activities, and
surveillance activities.