D471 WGU PA QUESTIONS AND CORRECT
DETAILED ANSWERS | ALREADY SCORED A+ |
NEWLY UPDATE 2026
Save
Terms in this set (70)
At which stage of the supply chain Downstream
does a distributor operate?
Which technology helps with the 3D Printing
quick production of product models
and prototypes for an organization?
What is an example of big data being Global positioning systems data in logistics
utilized in a supply chain?
In a new assembly line, workers are Experience curve
becoming more competent with
increased production volumes and
manufacturing costs are being
reduced.
,A healthcare company is producing Make to stock
large volumes of toothpaste and
toothbrushes and is replenishing
shelves at multiple retail stores
according to forecasting.
Which product positioning strategy is
being used?
, A furniture shop requires four of its Carpenter 2
carpenters to work in sequence to
produce a table. Each carpenter has
a capacity rating of one to four
based on the part of the table being
created. The capacity rating and
process time for each carpenter is:
Carpenter 1: Capacity rating
=
4
Process time
=
12
m
i
n
u
t
e
s
Carpenter 2: Capacity rating
=
2
Process time
=
18
m
i
n
u
t
e
s
DETAILED ANSWERS | ALREADY SCORED A+ |
NEWLY UPDATE 2026
Save
Terms in this set (70)
At which stage of the supply chain Downstream
does a distributor operate?
Which technology helps with the 3D Printing
quick production of product models
and prototypes for an organization?
What is an example of big data being Global positioning systems data in logistics
utilized in a supply chain?
In a new assembly line, workers are Experience curve
becoming more competent with
increased production volumes and
manufacturing costs are being
reduced.
,A healthcare company is producing Make to stock
large volumes of toothpaste and
toothbrushes and is replenishing
shelves at multiple retail stores
according to forecasting.
Which product positioning strategy is
being used?
, A furniture shop requires four of its Carpenter 2
carpenters to work in sequence to
produce a table. Each carpenter has
a capacity rating of one to four
based on the part of the table being
created. The capacity rating and
process time for each carpenter is:
Carpenter 1: Capacity rating
=
4
Process time
=
12
m
i
n
u
t
e
s
Carpenter 2: Capacity rating
=
2
Process time
=
18
m
i
n
u
t
e
s