EM 385 1-1 EXAM QUESTIONS AND
ANSWERS 2026 VERIFIED.
The SSHO must have completed or have the equivalent to __________ - ANS OSHA 20
Constructions or OSHA 20 general Industries
Any equipment that is damaged, malfunctioning or was subjected to a fall must be -
ANS Removed from service and replaced
When Workers will be in or around excavation a competent person must conduct documented
inspections of each excavation, the adjacent areas and protective systems before each work site
and through the work shift as dictated by the work being done and ______ - ANS
for workers with a body weight less than _____ - ANS 130lbs
For portable ladders the length of single ladders or individual sections of ladders must not
exceed - ANS 30ft
First aid and CPR availability is not - ANS 30 minutes
When working on a roof points of access materials handling areas and storage areas must ____
- ANS be connected to the work area by a clear access path formed by two warning lines
Which of the following does not need to be included in the AHA for hot work - ANS the
number of fire extinguishers within a 500 ft radius of the hot work
@2026/2027 ALLRIGHTS RESERVED.
, When an unqualified person is working in an elevated position near overhead lines with a
normal voltage of 50V or less in a location that allows access from the ground, near enough that
a hazard might exist. What is the minimum clearance distance that must be maintained for the
person and the longest conductive object tool being used - ANS 10ft
When access to excavation in excess of _______ ft in depth requires stairs ramps and
mechanical personnel, hoist shall be provided - ANS 20ft
Signs warning of the presence of construction site, hazards and requiring unauthorized persons
to keep out shall be posted every ______ft of fencing - ANS 150ft
what is not a requirement for PFD - ANS the PFDS must provide a minimum buoyancy of
80lbs
Work areas shall be inspected ________ for adequate housekeeping and findings shall be
recorded - ANS daily
Gaurd every hatchway and chute floor opening with a _______ - ANS hidge floor-opening
cover
Respiratory protection programs shall address - ANS
Whenever sound pressure levels equal or exceed ________dB - ANS 85
The contracting officer is responsible for reviewing safety and occupational health documents
for compliance with ________ - ANS laws and regulations
For excavation and trenches in depths greater than ______ both an excavation trenching plan
and a AHA are requried - ANS 5ft
@2026/2027 ALLRIGHTS RESERVED.
ANSWERS 2026 VERIFIED.
The SSHO must have completed or have the equivalent to __________ - ANS OSHA 20
Constructions or OSHA 20 general Industries
Any equipment that is damaged, malfunctioning or was subjected to a fall must be -
ANS Removed from service and replaced
When Workers will be in or around excavation a competent person must conduct documented
inspections of each excavation, the adjacent areas and protective systems before each work site
and through the work shift as dictated by the work being done and ______ - ANS
for workers with a body weight less than _____ - ANS 130lbs
For portable ladders the length of single ladders or individual sections of ladders must not
exceed - ANS 30ft
First aid and CPR availability is not - ANS 30 minutes
When working on a roof points of access materials handling areas and storage areas must ____
- ANS be connected to the work area by a clear access path formed by two warning lines
Which of the following does not need to be included in the AHA for hot work - ANS the
number of fire extinguishers within a 500 ft radius of the hot work
@2026/2027 ALLRIGHTS RESERVED.
, When an unqualified person is working in an elevated position near overhead lines with a
normal voltage of 50V or less in a location that allows access from the ground, near enough that
a hazard might exist. What is the minimum clearance distance that must be maintained for the
person and the longest conductive object tool being used - ANS 10ft
When access to excavation in excess of _______ ft in depth requires stairs ramps and
mechanical personnel, hoist shall be provided - ANS 20ft
Signs warning of the presence of construction site, hazards and requiring unauthorized persons
to keep out shall be posted every ______ft of fencing - ANS 150ft
what is not a requirement for PFD - ANS the PFDS must provide a minimum buoyancy of
80lbs
Work areas shall be inspected ________ for adequate housekeeping and findings shall be
recorded - ANS daily
Gaurd every hatchway and chute floor opening with a _______ - ANS hidge floor-opening
cover
Respiratory protection programs shall address - ANS
Whenever sound pressure levels equal or exceed ________dB - ANS 85
The contracting officer is responsible for reviewing safety and occupational health documents
for compliance with ________ - ANS laws and regulations
For excavation and trenches in depths greater than ______ both an excavation trenching plan
and a AHA are requried - ANS 5ft
@2026/2027 ALLRIGHTS RESERVED.